SCP-6693
Keter
~
medium confidence
SCP-6693
Expected annual
$2.4M
One-time setup
$4.3M
Annual recurring
$2.4M
Personnel
14
Initial setup dominated by site acquisition, rapid-response readiness, and insurance/litigation reserves (~$4.3M one-time). Annual operations driven by staff wages, legal/liaison costs, memetic/research support and contingency provisioning (~$2.37M/yr).
One-Time Capital Costs
Total: $4.3M
Annual Recurring Costs
Total: $2.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.4M/yr
Normal, uneventful year with standard operations, no major incidents or large contractual payments.
steady_operations
scheduled_drills
standard_tribute_levels
🚨
Minor Incident
$2.5M/yr
Localized vandalism, small ritual payment/upset requiring partial replacement of topiary or short rapid-response deployment and minor legal/consultant costs.
vandalism_to_topiary
small_ritual_payment
short_rapid_response_deployment
🚨
Major Breach
$3.6M/yr
Significant contractual renegotiation or breach requiring large ceremonial payment, extensive legal action, emergency rapid-response deployment and possible compensation payouts.
contract_default
large_ritual_demand
multi-unit_response_and_litigation
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Specialist Observer (believer-qualified) | 4 | [#8] Night observers selected for perceptual criteria; rotation sized to cover 1–4 a.m. window. |
| Security Officer / MTF Agent (night security) | 2 | [#9] Night guards for perimeter and response to mundane threats. |
| Research Scientist | 2 | [#14] Researchers/analysts handling Gehenna-class study tasks and report production. |
| Diplomatic Liaison / Contract Manager | 1 | [#10] Senior negotiator maintaining THEOLOGICAL PLANAR FIELD 77-34 contractual obligations and travel/ceremonial coordination. |
| Medical Officer / Psychologist | 1 | [#15, #16] On-call psychological services and medical monitoring for staff exposed to mood effects. |
| Engineer / Maintenance | 1 | [#5, #6, #27] Responsible for generator/UPS maintenance, sensor upkeep and site infrastructure. |
| Rapid Response Team Member | 2 | [#23] Small rapid-response unit trained for thaumaturgic/ritual containment and night deployments. |
| Administrative Staff / Project Coordinator | 1 | [#11, #19] Administrative lead for scheduling, contractor coordination, cover-story liaison and local relations. |
Confidence Notes
Estimates use midpoints of analyst ranges and explicit line items; staffing and legal/tribute obligations are the largest uncertain drivers (variable by site reuse, contractor availability, and negotiated terms), so confidence is medium rather than high.