SCP-6698
Safe
✓
high confidence
SCP-6698
Expected annual
$1.3M
One-time setup
$1.7M
Annual recurring
$1.3M
Personnel
18
Initial acquisition, site conversion, and specialized spectral/robotic equipment drive a one-time setup cost of $1,695,000. Recurring annual operations are dominated by personnel wages and security, totaling $1,322,000 per year.
One-Time Capital Costs
Total: $1.7M
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal uneventful year with standard monitoring, research, and maintenance; no containment incidents.
no_incidents
routine_research
standard_staff_rotations
🚨
Minor Incident
$1.4M/yr
Small containment-related event (medical response, local contamination, limited recovery) requiring emergency response and local amnestic/cover actions.
local_contamination
medical_evacuations
small_recovery_operation
🚨
Major Breach
$1.8M/yr
Significant containment breach requiring multi-day recovery, forensic investigation, equipment replacement, and heightened cover operations.
containment_breach
large_scale_recovery
public_exposure_risk
🚨
Research Scaleup
$1.6M/yr
Decision to scale up research requiring additional short-term equipment purchases and contracted specialists (not full relocation).
promising_data
need_for_additional_instruments
temporary_staffing_expansion
Personnel
18 total
| Role | Count | Notes |
|---|---|---|
| Site Director / Executive Staff | 1 | [#12] One Site Director to oversee Provisional Site-229 and coordinate with Department of Spectral Phenomena. |
| Research Scientist | 4 | [#12] Spectral research staff (3–5; midpoint used = 4) conducting experiments and analysis. |
| Engineer / Maintenance / Lab Technician | 2 | [#13] Two technical support staff for equipment operation, maintenance, and sample processing. |
| Security Officer / MTF Agent | 8 | [#14] 24/7 posted security with rotations (6–8 personnel; midpoint biased to 8 to ensure full coverage). |
| Medical Officer | 1 | [#15] Paramedic/medic on-call or shared coverage for routine screenings and incident response. |
| Class-D Personnel | 2 | [#16] D-class program operational presence (rotating test subjects as required for experiments). |
Confidence Notes
Analyst notes provide detailed line-item estimates and midpoints for all 25 numbered items; mappings are explicit and most costs are standard (property, equipment, salaries). Remaining uncertainty is limited to low-probability incident frequency and contingency sizing.