SCP-6721
Unknown
?
low confidence
SCP-6721
Expected annual
$4.2M
One-time setup
$9.2M
Annual recurring
$3.8M
Personnel
9
Estimated one-time setup costs are approximately $9.19M driven by secure cell construction, a secure research lab buildout, contingency reserves, and initial breach-response assets. Annual operating costs are approximately $4.77M/yr driven mainly by rapid-response/tactical readiness, research operations, and ongoing security/clinical staffing.
One-Time Capital Costs
Total: $9.2M
Annual Recurring Costs
Total: $3.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.8M/yr
Normal operational year with no major incidents; routine research and containment operations proceed as planned.
no_breach
routine_research_activity
scheduled_training_and_maintenance
🚨
Minor Incident
$5.1M/yr
Limited containment incident or localized escape attempt requiring tactical response, minor repairs, and PR/legal engagement.
localized_breach
small-scale_injury_or_property_damage
limited_public_exposure
🚨
Major Breach
$7.3M/yr
Full containment breach requiring multi-day response, substantial remediation, replacement of equipment, and accelerated research/neutralization efforts.
sustained_breach
multiple_casualties_or_infrastructure_damage
activating_breach_recovery_reserve
🚨
Catastrophic Breach
$14.8M/yr
Widespread containment failure with severe casualties, major site damage, public exposure, and multi-million-dollar remediation and legal consequences.
site-wide_breach
public_exposure
long-term_remediation_and_relocation
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#2] Continuous coverage 'two guards at all times' implies ~6 FTEs to staff shifts, included in staff_wages estimate. |
| Medical Officer | 3 | [#9] On-call physicians/critical care nurses and contract psychiatrists for suicide-prevention and emergency care; combined clinical FTEs included in staff_wages estimate. |
Confidence Notes
The SCP file and analyst notes provide ranges and high uncertainty about biological/biohazard properties and required biosafety level; many line items are contingent on unknown anomalous behavior. Estimates use mid-range assumptions and Foundation budgeting heuristics; significant variance (+/- large multiples) is possible.