SCP-6740
Unknown
?
low confidence
SCP-6740
Expected annual
$1.2M
One-time setup
$3.0M
Annual recurring
$1.2M
Personnel
8
Estimated one-time capital and contingency needs are ~$3.03M driven primarily by structural/engineering work and a dedicated contingency reserve; recurring annual costs are ~ $1.17M driven by staff wages, ongoing research, security, and maintenance.
One-Time Capital Costs
Total: $3.0M
Annual Recurring Costs
Total: $1.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.2M/yr
Normal year with no major incidents: routine operations, staff wages, maintenance, and ongoing research.
no_incident
routine_operations
🚨
Minor Incident
$1.3M/yr
Limited containment events requiring incident response, minor repairs, extra legal/PR work, and short-term increased staffing.
localized_breach
medical_exposure
minor_structural_repair
🚨
Major Breach
$6.2M/yr
Significant containment failure requiring large-scale response, use of contingency funds, major remediation, and potential relocation.
major_containment_failure
large_scale_exposure
extended_relocation_or_remediation
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 3 | [#11] Assigned research staff for monitoring, experiments, and reporting. |
| Security Officer / MTF Agent | 4 | [#3] Dedicated or augmented security presence for the E‑Wing entrance and SCP area across shifts. |
| Administrative Staff | 1 | [#2] Access-control desk clerk / sign-in administration at the E‑Wing entrance. |
Confidence Notes
The source file provides little hazard detail and the analyst supplied wide ranges; many items are speculative and contingent on whether SCP-6740 is inert or hazardous, so estimates are rough order-of-magnitude judgments.