SCP-6748
Unknown
~
medium confidence
SCP-6748
Expected annual
$3.6M
One-time setup
$3.2M
Annual recurring
$3.4M
Personnel
17
Estimated one-time startup costs are approximately $3.19M driven by site work, contingency reserve, secure storage and specialized equipment; recurring annual costs are ~ $3.42M/yr dominated by security staff wages, STF readiness and program overhead.
One-Time Capital Costs
Total: $3.2M
Annual Recurring Costs
Total: $3.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.4M/yr
Normal year with only planned recurring operations and no major incidents.
routine_surveillance
scheduled_maintenance
🚨
Minor Incident
$3.9M/yr
Localized uptick in anomalous activity requiring multiple ad hoc STF deployments, targeted repairs, and additional amnestic administrations.
localized_geometry_change
new_entities_detected
increased_missing_person_reports
🚨
Major Breach
$5.8M/yr
Significant spatial restructuring or expansion forcing evacuations, major emergency containment, large repairs, and heavy PR/legal response.
rapid_geometry_expansion
mass_disappearances
structural_failure
🚨
Catastrophic Breach
$8.4M/yr
Major uncontrollable event (widespread spatial outbreaks, mass casualties/disappearances) requiring large-scale response and program scale-up.
multi-site_spatial_outbreak
mass_casualties
public_exposure
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#4] Round-the-clock coverage using retired agents/contract guards (estimated 9–12 guards in notes; 10 assumed here consistent with staff wage totals). |
| Surveillance Operator | 3 | [#5] Operators to monitor camera feeds and coordinate STF calls (2–3 operators noted; 3 assumed). |
| Site Manager / Supervisor | 1 | [#5] Single site manager to liaise with NPS and manage documentation. |
| Research Scientist / Data Analyst | 3 | [#22, #12] Geometrics analysts, data scientists and artifact specialists to perform mapping, modeling and artifact analysis (staffing level chosen to match recurring research wage allocation). |
Confidence Notes
Analyst notes list specific line items and ranges for most costs, enabling midpoint estimates; uncertainty remains due to wide ranges on structural stabilization, contingency needs and incident frequencies, so confidence is medium.