SCP-6750
Unknown
~
medium confidence
SCP-6750
Expected annual
$1.7M
One-time setup
$5.4M
Annual recurring
$1.6M
Personnel
6.5
Initial one-time setup is dominated by R&D and construction of a probability-shielded observation chamber (~$5.0M) plus containment upgrades, totaling about $5.44M one-time; recurring annual operations (security, testing staff, contingency reserves, medical monitoring, legal/insurance, and monitoring systems) run approximately $1.64M/yr.
One-Time Capital Costs
Total: $5.4M
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Normal year with containment in place, no incidents beyond routine operations.
no activations
routine audits and maintenance
🚨
Minor Incident
$1.7M/yr
Localized activation or small loss event causing limited repairs/medical response and short-term overtime.
small loss event
local equipment damage
single-person medical observation
🚨
Major Breach
$2.4M/yr
Significant activation leading to multi-unit response, substantial repairs/replacements, legal action, and temporary testing suspension.
contained breach
multiple injuries/facility damage
emergency contracting
🚨
Catastrophic Breach
$6.6M/yr
Severe escalation (site-level failures, multiple fatalities, extended recovery and rebuild, wide legal/PR costs).
site-wide power/grid collapse
cascading containment breaches
large-scale loss events
Personnel
6.5 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 2 | [#4] Two designated guards for enforcement and rapid response. |
| Research Scientist (PI) | 1 | [#6] Principal Investigator maintaining oversight of any sanctioned work and monitoring. |
| Researcher | 2 | [#6] Two researchers retained for monitoring, modelling, and potential future tests. |
| Technician / Lab Tech | 1 | [#6] Hands-on technician for equipment, bio/medical sampling support, and test setup. |
| IT Support (FTE) | 0.5 | [#6] 0.5 FTE data/IT support for instrumentation, secure logging, and data integration. |
Confidence Notes
Line items and cost magnitudes are well-specified in analyst notes for equipment, staffing, and R&D, but the anomalous nature (probability-displacement effects) and uncertain incident frequency/scale introduce moderate uncertainty in recurring and scenario-cost estimates.