SCP-6756
Unknown
~
medium confidence
SCP-6756
Expected annual
$44.4M
One-time setup
$12.1M
Annual recurring
$43.1M
Personnel
24
Initial capital outlays are moderate (~$12.1M) driven by potential vessel purchase and contingency/reserve funds; recurring annual costs are dominated by an explicit mandated $33M/year plus operations, staffing, monitoring and legal/cover budgets, totaling roughly $43.1M/year.
One-Time Capital Costs
Total: $12.1M
Annual Recurring Costs
Total: $43.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$43.1M/yr
Normal operational year with scheduled seeding, monitoring, routine maintenance, and no major incidents.
quarterly_seeding
routine_monitoring
no_incidents
🚨
Minor Incident
$43.9M/yr
Localized equipment failure or small spill requiring emergency repairs, short-term remediation, or expedited replacement parts and overtime.
local_freezer_failure
minor_spill
generator_outage
🚨
Major Breach
$48.1M/yr
Significant containment breach or vessel incident requiring large-scale recovery operations, remediation, and legal/PR response.
vessel_sinking
significant_contamination
multi-day_recovery_operation
🚨
Catastrophic Release
$93.1M/yr
Widespread ocean contamination or public exposure triggering multi-jurisdictional cleanup, lawsuits, and major political fallout.
widespread_ocean_contamination
public_exposure
multi-site_release
Personnel
24 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#11] 24/7 armed/unarmed security rotation (8–12 personnel range). |
| Containment Technician | 3 | [#9] Dedicated containment technicians (coverage requires 2–3 technicians). |
| Research Scientist | 2 | [#9, #13] Two full-time materials scientists/chemists for monitoring and lab analysis. |
| Engineer / Maintenance | 3 | [#4, #12] Maintenance techs for freezer/generator/test runs and sample-prep equipment upkeep; includes ship engineer support. |
| Ship Crew (Captain/Deckhands) | 4 | [#6, #10] Captain, engineer, and deckhands for Feisty Frolic operations and seeding missions. |
| Administrative Staff | 2 | [#16, #24] HR/procurement/accounting support tied to administrative overhead and cover-story disbursements. |
Confidence Notes
Many line items are specified with ranges and a concrete mandated $33M/year provides a high-certainty dominant recurring cost; however substantial uncertainty remains around vessel purchase vs charter, environmental liability magnitudes, and contingency sizing, yielding a medium confidence.