SCP-6761
Unknown
~
medium confidence
SCP-6761
Expected annual
$51K
One-time setup
$193K
Annual recurring
$48K
Personnel
1.4
Estimated one-time setup of $193,300 primarily driven by containment construction, instrumentation and contingency reserves; ongoing annual operations about $48,060/yr driven by vintage-hardware maintenance retainer, experimental research, and routine staff/maintenance costs.
One-Time Capital Costs
Total: $193K
Annual Recurring Costs
Total: $48K/yr
Cost Scenarios
📊
Baseline
(baseline)
$48K/yr
Normal uneventful year with routine operations, maintenance, and research only.
no incidents
regular maintenance
planned research activities
🚨
Minor Incident
$58K/yr
Small containment incident or localized outside-room sorting requiring cleanup, overtime, and minor repairs.
localized sorting outside cell
equipment damage requiring repair
overtime and inventory recovery
🚨
Transmission Event
$98K/yr
Anomalous transmission to staff or another host requiring medical evaluation, extended monitoring, and containment escalation.
memetic transmission to personnel
need for medical/psychological treatment
extended forensic investigation
🚨
Major Breach
$248K/yr
Significant propagation or severe containment breach requiring emergency contractors, site remediation, legal action and potential decommissioning.
unauthorized duplication/emulation
large-scale property damage
need for specialist disposal and remediation
Personnel
1.4 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (Level-2 Researcher) | 1 | [#9] Authorized daily operator; 30 minutes/day averaged into staff_wages estimate. |
| Custodial / Support Staff | 0.1 | [#15] Part-time cleaning and reorganization labor after sorting events. |
| Security Monitoring / Contractor | 0.15 | [#11] On-call security monitoring equivalent to ~0.1-0.2 FTE; budgeted as contract. |
| Engineer / Electronics Technician | 0.05 | [#16] Vintage-hardware maintenance retainer; specialist visits, not full-time. |
| Administrative Staff | 0.1 | [#10, #19] Authorization, procurement, and legal/cover coordination overhead. |
Confidence Notes
Estimates are based on analyst line-item costs and Foundation-standard containment assumptions; hardware rarity, refurbishment uncertainty, and unpredictable anomalous behaviors (transmission / sorting beyond cell) introduce moderate uncertainty despite detailed budgeting.