SCP-6763
Unknown
~
medium confidence
SCP-6763
Expected annual
$28.9M
One-time setup
$61.1M
Annual recurring
$27.9M
Personnel
41
First-year stabilization requires substantial one-time capital and remediation spending (≈ $61.1M), driven primarily by opportunity-cost remediation, severance/retention, and facility/IT changes; ongoing annual operations are large as well (~ $20.6M/yr), driven by personnel, clinical care, legal/cover operations, and R&D.
One-Time Capital Costs
Total: $61.1M
Annual Recurring Costs
Total: $27.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$27.9M/yr
Uneventful year after initial stabilization: no major new mass resignations or public exposure; regular recurring response and programmatic costs only.
no major additional resignations
no public exposure
programs operate as planned
🚨
Minor Incident
$25.6M/yr
Localized surge in resignations / mid-scale memetic flare requiring emergency retention payouts, targeted litigation, and short-term contractor surge.
localized mass resignations (tens of staff)
targeted whistleblower threats
need for emergency contractors and retention
🚨
Major Breach
$70.6M/yr
Systemic exodus and/or public exposure requiring large-scale cover operations, litigation, replacement-of-capacity, and realization of large opportunity/mission losses.
systemic >50% staff loss in key departments
public leak / whistleblower cascade
large-scale litigation or mission-impact realization
Personnel
41 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Antimemetics Specialist | 12 | [#1] Dedicated SCP-6763 Response Team (antimemetics, surrealistics, data scientists, ops liaison). |
| Clinician / Mental Health Specialist | 5 | [#6] Additional psychiatrists/clinical psychologists for surge clinical care. |
| Security Officer / MTF Agent | 10 | [#19] Additional site security hires to manage ingress/egress and escorts. |
| Contractor / Consultant (FT-equivalent) | 4 | [#4] Short-term contractors to backfill projects during hiring/training. |
| Replacement Researcher / Technician | 10 | [#2] Newly recruited replacement staff (recurring salary budget assumed). |
Confidence Notes
Estimates are based on detailed analyst notes with ranges for nearly every line item; however many items (memetic effects, opportunity costs, legal exposure) have wide uncertainty ranges and scenario-dependent one-time impacts, so confidence is moderate rather than high.