SCP-6772
Unknown
?
low confidence
SCP-6772
Expected annual
$15.9M
One-time setup
$121.3M
Annual recurring
$15.6M
Personnel
28
Initial one-time capital and contingency needs dominate (large facility work, contingency reserves and potential endowment), while recurring annual costs are driven by security staffing, heavy-containment operations, surveillance and legal/cover operations.
One-Time Capital Costs
Total: $121.3M
Annual Recurring Costs
Total: $15.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$15.6M/yr
Normal year with ongoing containment operations, surveillance, staff wages, and routine research; no major incidents.
no major incidents
stable containment
routine research and monitoring
🚨
Minor Incident
$16.4M/yr
Localized breach or public-facing incident requiring extra deployments, emergency medical care, temporary repairs and PR/legal response.
localized breach
emergency response deployments
limited property damage / medical treatment
🚨
Major Breach
$25.6M/yr
Significant containment failure or violent/large-scale incident requiring heavy-containment activation, large emergency fund drawdown, long repairs and high legal/settlement costs.
major breach
activation of Site-19 heavy unit
large-scale emergency response and settlements
Personnel
28 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 20 | [#1, #10] Rotating armed response and guard staff dedicated to SCP-6772 containment and capture operations; primary component of staff_wages. |
| Medical Officer | 4 | [#7, #12, #17] Physicians/nurses/forensic pathologists providing on-site care, monitoring and autopsy/forensic processing. |
| Engineer / Maintenance | 3 | [#4, #5, #23] Maintenance staff for containment systems, HVAC, redundant power and heavy-unit upkeep. |
| Administrative Staff | 1 | [#2, #14, #15] Admin/liaison for legal, cover-story, records, and coordination with local authorities. |
Confidence Notes
Many line items are range estimates and SCP-6772 remains uncontained with unknown properties; major cost drivers (need for heavy containment, endowment vs annual custody, and contingency sizing) are high-uncertainty.