SCP-6781
Thaumiel
?
low confidence
SCP-6781
Expected annual
$16.1M
One-time setup
$39.2M
Annual recurring
$15.7M
Personnel
92
Estimated initial one-time capital expenditure ≈ $39.2M driven primarily by vault construction, contingency and decommissioning reserves, and site stabilization; recurring operations ≈ $15.7M/year dominated by staff wages, logistics/transport, and power/maintenance.
One-Time Capital Costs
Total: $39.2M
Annual Recurring Costs
Total: $15.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$15.7M/yr
Normal operational year with no major incidents; routine maintenance, staffing, and resupply only.
steady operations
scheduled maintenance
regular rotations
🚨
Minor Incident
$16.7M/yr
Localized containment or geotechnical event requiring short-term remediation, equipment replacement, and increased logistics/medical activity.
small cave collapse / localized structural damage
minor containment breach requiring temporary lockdown
🚨
Major Breach
$30.7M/yr
Significant containment/structural failure or large-scale incident requiring major reconstruction, extended operations, and large contingency drawdown.
large cave collapse or flooding
major anomalous interaction requiring reconstruction and extended remediation
Personnel
92 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / Site Security | 12 | [#1] 24/7 perimeter and internal security posts; lower-end headcount from analyst range. |
| MTF / Rapid Response Team | 20 | [#2] Two rotating specialized response teams (operators, techs, medics); lower-end staffing chosen. |
| Research Scientist / Archivist / Technician / Engineer | 60 | [#10] Core on-site RAISA Vault staff, technicians, systems engineers, and administrative personnel (baseline staffing). |
Confidence Notes
Large uncertainty in cave geometry, unknown preexisting infrastructure, optional subsea/fiber choices, and anomalous interactions make structural and contingency costs highly uncertain; analyst provided wide ranges so baseline uses conservative/lower-end choices.