SCP-680
Safe
~
medium confidence
SCP-680
Expected annual
$1.1M
One-time setup
$918K
Annual recurring
$1.1M
Personnel
8.0
Estimated one-time setup of ~$918k driven by diagnostics bay build-out, containment locker and equipment; recurring operations ~ $1.10M/yr driven primarily by staff wages, analytical access, logistics and a budgetary contingency.
One-Time Capital Costs
Total: $918K
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal year with scheduled tests, routine maintenance and no major incidents or program expansion.
scheduled_tests
routine_maintenance
no_incidents
🚨
Minor Incident
$1.2M/yr
Small filament overheating or minor localized incident requiring cleanup, overtime and limited repairs.
filament_overheat
minor_cleanup
overtime
🚨
Major Fire
$1.4M/yr
Significant filament-induced fire or contamination requiring major cleanup, external contractors and investigations.
fire_damage
external_contractors
facility_repairs
🚨
Inter Site Deployment
$1.2M/yr
Cross-site deployment requiring airlift/charter and heavy security for a given year.
cross_country_airlift
armored_escort
route_security
🚨
Research Program Scale Up
$1.6M/yr
Decision to scale SCP-680 into a programmatic diagnostic service across multiple projects, requiring expanded budget.
program_scale_up
multi-site_diagnostics
expanded_staffing
Personnel
8.0 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (Level-3) | 1 | [#9] Senior researcher with Level-3 authorization; budgeted at ~120k/yr. |
| Research Technical Assistant | 2 | [#9] Technical assistants to run tests and sample prep; budgeted at ~70k/yr each. |
| Security Officer / MTF Agent | 2 | [#9] Security/transport guards for artifact movement and site security; budgeted at ~45k/yr each. |
| Medical Officer / Medical Tech | 1 | [#9, #14] On-call med tech for pre/post-test monitoring; salary and program costs budgeted separately. |
| Administrative Staff | 0.5 | [#9] 0.5 FTE admin for scheduling, records and logistics. |
| Data Analyst | 1.5 | [#15] Analysts for Morse parsing, QA/QC and archiving (1–2 FTE budgeted aggregated). |
Confidence Notes
Article provides detailed operational constraints and cost ranges but many items are range-based (lab purchase vs pay-per-use, incident sizes). Estimates use midpoints and programmatic assumptions; contingency included to reflect uncertainty.