SCP-685
Euclid
~
medium confidence
SCP-685
Expected annual
$25.0M
One-time setup
$99.5M
Annual recurring
$22.3M
Personnel
89
Initial one-time construction and contingency reserves are the dominant costs (~$99.5M). Annual operations are substantial (~$22.3M/yr) driven by security, land monitoring, satellite/UAV data feeds, and research/maintenance.
One-Time Capital Costs
Total: $99.5M
Annual Recurring Costs
Total: $22.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$22.3M/yr
Normal year with no major incidents; routine operations and maintenance only.
routine_monitoring
no_detonations
no major_equipment_failures
🚨
Minor Explosive Detonation
$23.1M/yr
Small-scale use of charges requiring cleanup, limited replacement and legal/PR work.
use_of_C4_charges
localized_env_cleanup
replacement_charges
🚨
Major Detonation And Political Exposure
$37.3M/yr
Large detonation or breach causing extensive cleanup, infrastructure damage and political/cover expenses.
failed_primary_containment
extensive_environmental_damage
national_level_exposure
🚨
Dedicated Satellite Launch
$147.3M/yr
Decision to build/launch a dedicated small-sat constellation for persistent monitoring (capital-intensive event).
loss_of_lease_or_intel_access
requirement_for_persistent_own_satellite
Personnel
89 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / Guard | 40 | [#3] Site security roster (40 personnel referenced in notes). |
| MTF Specialist | 30 | [#3] On-call Mobile Task Force contingent (20–40; 30 assumed). |
| Research Scientist / Lab Staff | 7 | [#16] PI, postdocs and technicians funded by research budget. |
| Medical Officer / Nurse | 2 | [#9] On-site medical staff to manage quarantine and health surveillance. |
| Engineer / Maintenance | 5 | [#14, #5] Site engineers and maintenance personnel for generators, radars, catwalk and structural systems. |
| Administrative Staff | 4 | [#24, #15] HR, procurement, IT/admin to run classified operations and cover logistics. |
| Site Director / Executive Staff | 1 | [#1] Single site director / executive lead. |
Confidence Notes
Line-item operational and construction costs are reasonably bounded by analyst ranges, but political/state-level items (land expropriation extremes, nuclear contingency, large-scale cover-ups) are highly uncertain and unquantified, so overall confidence is medium.