SCP-687
Safe
~
medium confidence
SCP-687
Expected annual
$480K
One-time setup
$127K
Annual recurring
$476K
Personnel
3
One-time capital costs for containment and instrumentation are modest-to-moderate (~$126k), dominated by research instruments and specialist forensic campaigns; recurring annual costs are dominated by personnel, medical/psychological care, and contingency reserves (~$476k/yr).
One-Time Capital Costs
Total: $127K
Annual Recurring Costs
Total: $476K/yr
Cost Scenarios
📊
Baseline
(baseline)
$476K/yr
Normal year with routine testing cadence, regular UPS replacements, and ongoing care/programs; no major incidents or breaches.
routine_testing
standard_staffing
scheduled_maintenance
🚨
Minor Incident
$506K/yr
Localized adverse event causing increased medical/psychological care and minor equipment replacement; no containment breach.
severe_psychological_sequelae
equipment_spike_damage
small legal/cover payout
🚨
Major Breach
$676K/yr
Significant personnel harm or escape-like incident that requires large legal payouts, extended disability support, external forensic campaigns, and heightened containment measures.
containment_breach
major_legal_action
large_disability_payouts
🚨
Catastrophic Breach
$1.5M/yr
Severe anomalous escalation with personnel disappearance or major historical alteration requiring full-scale emergency response, O5-level intervention, site relocation, and long-term remediation.
loss_of_personnel
wide_historical_alteration
major_public_exposure
Personnel
3 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Retrocomputing Specialist | 1 | [#13] Senior researcher (1.0 FTE) responsible for protocol design, supervised testing, and analysis; fully burdened salary included in staff_wages. |
| Research Technician / Lab Technician | 1 | [#13] Technician support for instrumentation, data capture, and equipment handling; included in staff_wages. |
| Security Officer / Escort | 1 | [#14] Site security officer time for access approvals, escorting, and administrative overhead; included in staff_wages. |
Confidence Notes
Medium confidence: containment and equipment needs are well-described, but recurring costs (testing cadence, number/severity of affected personnel, and contingency spending) are highly variable and rely on operational tempo assumptions.