SCP-6870
Safe
~
medium confidence
SCP-6870
Expected annual
$1.2M
One-time setup
$2.8M
Annual recurring
$1.2M
Personnel
8
[#28] Initial capital costs are estimated at roughly $2,810,000 (property purchase, site conversion, RF containment/shaft access and contingency are the largest drivers); ongoing annual operations are estimated at about $1,154,000/yr, driven primarily by personnel (security and technical) and research/monitoring needs.
One-Time Capital Costs
Total: $2.8M
Annual Recurring Costs
Total: $1.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.2M/yr
Normal year with routine operations, monitoring, maintenance and research activities but no major incidents.
routine_operations
scheduled_maintenance
ongoing_research
🚨
Minor Incident
$1.2M/yr
Localized equipment failure or small containment incident requiring emergency repairs, overtime and limited public cover actions.
localized_equipment_failure
minor_containment_breach
emergency_repairs
🚨
Major Breach
$1.7M/yr
Significant containment failure or damage to SCP-6870-1 interfacing systems requiring major replacement, forensic investigation and extended response.
hardware_destruction
major_containment_response
extended_repair_and_investigation
🚨
Research Breakthrough Requiring Scale Up
$1.5M/yr
Discovery that necessitates expanded studies, new instrumentation and temporary staffing increases.
novel_anomalous_findings
expanded_study_campaign
temporary_scale_up
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#4] Four permanent STF operators providing 24/7 site security (salaries+benefits+overtime included in staff_wages). |
| Radio Technician | 2 | [#7] Two certified radio technicians based on-site (salary+benefits+backup travel included in staff_wages). |
| Data Analyst | 2 | [#22] Two analysts monitoring HF broadcasts and logs (salaries included in staff_wages). |
Confidence Notes
Analyst notes provide detailed line items and reasonable ranges, but large uncertainty remains from variable real-estate costs, RF-containment engineering choices, and unpredictable research outcomes; therefore medium confidence.