SCP-6904
Artifact
~
medium confidence
SCP-6904
Expected annual
$2.2M
One-time setup
$4.2M
Annual recurring
$2.2M
Personnel
12
Initial capital costs are dominated by building a specialized padded testing chamber, secure vault modifications, contingency reserves, and integrated robotics/instrumentation, resulting in multi-million-dollar up-front expenses. Recurring annual costs are driven by staff wages (24/7 security and technical/research staff), ongoing research funding, and legal/cover/contingency maintenance, totaling roughly $2.2M/year.
One-Time Capital Costs
Total: $4.2M
Annual Recurring Costs
Total: $2.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.2M/yr
Normal uneventful year with routine testing and maintenance; no major incidents or breaches.
routine testing
scheduled research activities
regular maintenance
🚨
Minor Incident
$2.3M/yr
Localized incident such as accidental damage, minor containment failure, personnel injuries requiring medical response, or small public exposure requiring limited legal/amnestics response.
failed interlock or procedural lapse
minor test mishap
small-scale contamination or injuries
🚨
Major Breach
$4.7M/yr
Significant containment breach or public exposure, mass injuries, large-scale cleanup, major legal/cover-up operations, emergency relocation or lengthy research interruption.
catastrophic interlock failure
public exposure/press scrutiny
large-scale demanifestation event affecting infrastructure or people
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#8] 24/7 armed/cleared guard staffing: 2per shift × 3 shifts = 6 on-duty personnel. |
| Research Scientist | 2 | [#9] Lead researcher plus FTE researchers for experiments and ontological modeling (portion of containment team). |
| Engineer / Maintenance | 2 | [#9] On-site technician and remote-operations engineer for robotics, interlocks, and facility maintenance. |
| Curator / Research Liaison | 1 | [#9] Curator/research liaison responsible for documentation, provenance and coordination. |
| Site Director / Executive Staff (HMCL Supervisor) | 1 | [#10] HMCL supervisor / program manager with approval authority and administrative overhead. |
Confidence Notes
Analyst notes provide detailed line items and reasonable ranges, enabling mid-confidence estimates; anomalous behavior (unobserved demanifestation mechanism) and site-specific variance (reuse of existing facilities, regional labor costs) create residual uncertainty.