SCP-6923
Unknown
?
low confidence
SCP-6923
Expected annual
$12.8M
One-time setup
$422.0M
Annual recurring
$12.5M
Personnel
56
Estimated upfront capital and construction costs are dominated by heavy civil works to moor and access the 419 m anomalous vessel and by specialized shielding/robotic systems; total initial outlay is in the low hundreds of millions. Annual operations (staff, security, power, research and maintenance) are tens of millions lower, around the low tens of millions per year with significant tail-risk for emergency salvage or disposal.
One-Time Capital Costs
Total: $422.0M
Annual Recurring Costs
Total: $12.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$12.5M/yr
Normal operational year with scheduled interviews, ongoing research, routine maintenance and no major incidents.
scheduled_interviews
routine_research
standard_maintenance
🚨
Minor Incident
$13.7M/yr
Limited containment incident (unauthorized entry, medical casualty, or spike in symbol generation) requiring emergency response, investigation, temporary suspension of operations and increased memetic mitigation.
unauthorized_entry
medical_casualty
localized_symbol_spike
🚨
Major Breach
$42.5M/yr
Severe escalation where symbol coverage approaches critical threshold (≥97%) or a major containment failure requiring emergency salvage, controlled destruction or deep-sea relocation contracts.
coverage_reaches_97_percent
catastrophic_symbol_spread
failed_containment_response
Personnel
56 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 12 | Project PARAGON research leads, thaumaturgists, junior researchers and lab technicians (covered in staff wages). |
| Security Officer / MTF Agent | 30 | 24/7 armed guards, aquatic rapid response, dive teams and on-site security staff (covered in staff wages). |
| Engineer / Maintenance | 8 | ROV operators, systems engineers and maintenance staff for life-support, power and robots. |
| Medical Officer | 2 | Onsite medics and emergency medical technicians; medical costs also in recurring medical budget. |
| Administrative Staff | 3 | Logistics, scheduling, compliance and PR/legal liaisons supporting operations. |
| Site Director / Executive Staff | 1 | Site-level oversight and project management. |
Confidence Notes
Estimates use midpoints of wide ranges from analyst notes; many costs depend on uncertain thaumaturgical program outcomes, salvage scenarios and local infrastructure, producing substantial tail risk and low confidence.