SCP-6928
Safe
~
medium confidence
SCP-6928
Expected annual
$1.7M
One-time setup
$2.2M
Annual recurring
$1.6M
Personnel
12
Initial one-time containment and research setup is approximately $2.19M driven by property acquisition, fortification, robotics and lab upgrades; ongoing annual operations are approximately $1.625M driven primarily by staff wages, medical/contract costs and a contingency reserve.
One-Time Capital Costs
Total: $2.2M
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Routine year with standard containment, monitoring, and scheduled maintenance; no major incidents or exposures.
no major breaches
regular operations
scheduled research only
🚨
Minor Incident
$1.7M/yr
Occasional trespasser or minor exposure causing a small number of ER visits, minor equipment repair, and limited legal/PR activity.
unauthorized entry
single acute medical incident
local press inquiry
🚨
Major Breach
$2.1M/yr
Significant containment breach with multiple staff exposures, equipment loss/damage, and prolonged medical/legal response.
multi-person exposure
equipment failure/damage
extended hospitalizations
🚨
Political Exposure
$2.6M/yr
Public scandal, FOIA or legal action forcing expanded cover-up, major legal settlements, and possible relocation or site buyout.
public disclosure
major lawsuit
governmental scrutiny
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 5 | [#6] 24/7 on-site security coverage (4–6 FTE equivalent; averaged to 5). |
| Remote Monitoring Operator | 3 | [#7] Continuous control-room staff to monitor cameras and sensors (2–3 operators; averaged to 3). |
| Research Scientist | 3 | [#10, #11] Research staff conducting psychography tests and data analysis (part of the 3–6 researcher team). |
| Psychologist | 1 | [#10, #13] Dedicated psychologist/mental-health specialist for screening, monitoring and aftercare (included in research team salaries/medical contracts). |
Confidence Notes
Estimates are order-of-magnitude and drawn from the analyst notes and typical Foundation containment patterns for a Safe-class, psychological/memetic hazard. Property acquisition and local costs are region-dependent and contingency needs are uncertain; memetic risks introduce operational variability.