SCP-6938
Thaumiel
?
low confidence
SCP-6938
Expected annual
$5.1M
One-time setup
$14.1M
Annual recurring
$5.1M
Personnel
13
First-year capital/setup costs are dominated by a recommended contingency reserve and specialized conversion infrastructure (~$14.1M one-time). Recurring annual costs center on personnel, indemnity reserves, research and maintenance (~$5.08M/year).
One-Time Capital Costs
Total: $14.1M
Annual Recurring Costs
Total: $5.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.1M/yr
Normal uneventful year with routine operations and no major incidents or relocations.
no incidents
routine maintenance
standard research schedule
🚨
Minor Incident
$5.4M/yr
Localized incident requiring a single rapid-response deployment or a short relocation and modest repairs.
unauthorized access attempt
sensor/tamper alarm with limited breach
single relocation or short-term contingency activation
🚨
Major Breach
$10.1M/yr
Significant containment failure or politically visible incident requiring major remediation, indemnity payments and partial site rebuild.
major breach
public exposure/political fallout
large-scale remediation
🚨
Operational Deployment
$5.3M/yr
Planned operational use of SCP-6938 to counter a narrative anomaly, requiring mobilization, oversight and temporary increased costs.
planned deployment for narrative containment
resource conversion and governance activation
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Project Lead / Principal Investigator | 1 | [#4] Senior lead with top clearance responsible for project oversight. |
| Research Scientist | 4 | [#4, #10] Dedicated research staff conducting verification experiments and protocol development. |
| Engineer / Technician | 2 | [#4] Engineering and technical staff for monitoring, maintenance and equipment support. |
| Security Officer / MTF Agent | 6 | [#5] On-site guards and rapid-response security staff for 24/7 physical security presence. |
Confidence Notes
Estimates use wide ranges from analyst notes and the object's anomalous capacity (resource-generation and narrative effects) introduces major uncertainty; contingency sizing and operational offsets are highly institution-dependent.