SCP-6938 Thaumiel ? low confidence
SCP-6938
Expected annual
$5.1M
One-time setup
$14.1M
Annual recurring
$5.1M
Personnel
13
First-year capital/setup costs are dominated by a recommended contingency reserve and specialized conversion infrastructure (~$14.1M one-time). Recurring annual costs center on personnel, indemnity reserves, research and maintenance (~$5.08M/year).
🏗️ One-Time Capital Costs Total: $14.1M
Contingency Reserve $10.0M
[#18] One-time contingency / rapid-response reserve for large-scale narrative incidents (institutional risk tolerance dependent).
Facilities $1.2M
[#1] Hardened, access-controlled vault construction with ballistic door, mantrap, decon antechamber and isolation.
Conversion Infrastructure Setup $1.1M
[#24] Buildout of infrastructure to receive, validate, convert, store and title resources generated by SCP-6938.
Initial Research And Lab Setup $400K
[#9] Initial research lab buildout, specialized experimental equipment and starting materials for verification experiments.
Governance Study Initial $300K
[#25] Initial research into governance, oversight and safe operational protocols for integrating generated resources.
Mobile Containment Kit $225K
[#19] Preparation of mobile containment/transport kit and specialized crates.
Legal Oversight Setup $162K
[#11] Formal oversight, ethics board and legal review setup and chartering.
Cover Infrastructure Setup $125K
[#12] Setup costs for front companies, facility lease structure and cover-story infrastructure.
Equipment $112K
[#2] Environmental control & continuous monitoring system (sensors, cameras, tamper alarms) setup.
Training Sop Development $100K
[#21] Initial development of SOPs, training program and tabletop exercise materials.
Strategic Valuation One Time $88K
[#28] Strategic valuation and opportunity-cost assessment to justify investment versus alternatives.
Secure Data Systems $65K
[#14] Hardened, air-gapped archival backups, encrypted removable media and tamper-evident logging hardware.
Background Check Initial $60K
[#6] Initial background investigations and security clearances for project team (initial costs).
Backup Power Setup $50K
[#16] Generator and UPS purchase/installation to maintain monitoring and environmental control.
Secure Communications Setup $48K
[#15] Dedicated secure communications and special comms procedures initial setup.
Psych Evaluation Initial $20K
[#7] Pre-placement psychological evaluations for authorized staff.
🔄 Annual Recurring Costs Total: $5.1M/yr
Internal Indemnity Reserve $2.0M/yr
[#23] Insurance-equivalent internal indemnity & asset accounting reserve to cover anomalous liabilities and political/legal fallout.
Staff Wages $1.4M/yr
[#4, #5] Primary personnel payroll including project lead, dedicated research team, engineers/technicians and on-site security staff.
Research And Monitoring $412K/yr
[#3, #10] Monitoring & sensor maintenance, data storage and telemetry plus recurring research operations (staff time, consumables, modeling time).
Cover Story And Legal $362K/yr
[#11, #13] Ongoing legal retainer, PR and cover operations (annual legal/PR retainer and coordination with government partners).
Conversion Infrastructure Operational $275K/yr
[#24] Ongoing operations, validation and conversion costs for resources produced by SCP-6938.
Facilities Maintenance $222K/yr
[#14, #15, #16, #27] Ongoing maintenance of secure data systems, secure communications, backup power fuel/maintenance, and standard facility lease/utilities/administrative overhead.
Governance Audits $125K/yr
[#25] Ongoing governance, oversight audits and controls for integration of generated resources.
Incident Response Exercises $125K/yr
[#26] Regular incident response exercises, cross-department coordination and travel for major exercises.
Supplies And Consumables $60K/yr
[#17] Consumables, lab supplies, replacement sensors and routine maintenance consumables.
Mental Health Support $40K/yr
[#7, #8] Ongoing psychological counseling, incident counseling and mental-health monitoring for exposed/authorized staff.
Training Recurring $30K/yr
[#21] Annual refresher training, drills and SOP maintenance.
Record Sanitization $15K/yr
[#22] Record redaction, sanitized documentation and memetic safety reviews for internal publishing.
Background Check Recurring $12K/yr
[#6] Periodic re-vetting and continuous background checks for cleared staff.
Logistics And Transport $0/yr
[#20] Per-move operational cost (planning, escort, transport) estimated at $50,000–$250,000 per move; baseline assumes no relocation in an uneventful year.
Cost Scenarios
📊 Baseline (baseline) $5.1M/yr
92.5% probability / year
Normal uneventful year with routine operations and no major incidents or relocations.
no incidents routine maintenance standard research schedule
🚨 Minor Incident $5.4M/yr
5.0% probability / year +$300K vs baseline
Localized incident requiring a single rapid-response deployment or a short relocation and modest repairs.
unauthorized access attempt sensor/tamper alarm with limited breach single relocation or short-term contingency activation
🚨 Major Breach $10.1M/yr
0.5% probability / year +$5.0M vs baseline
Significant containment failure or politically visible incident requiring major remediation, indemnity payments and partial site rebuild.
major breach public exposure/political fallout large-scale remediation
🚨 Operational Deployment $5.3M/yr
2.0% probability / year +$250K vs baseline
Planned operational use of SCP-6938 to counter a narrative anomaly, requiring mobilization, oversight and temporary increased costs.
planned deployment for narrative containment resource conversion and governance activation
👥 Personnel 13 total
Role Count Notes
Project Lead / Principal Investigator 1 [#4] Senior lead with top clearance responsible for project oversight.
Research Scientist 4 [#4, #10] Dedicated research staff conducting verification experiments and protocol development.
Engineer / Technician 2 [#4] Engineering and technical staff for monitoring, maintenance and equipment support.
Security Officer / MTF Agent 6 [#5] On-site guards and rapid-response security staff for 24/7 physical security presence.
📋 Confidence Notes
Estimates use wide ranges from analyst notes and the object's anomalous capacity (resource-generation and narrative effects) introduces major uncertainty; contingency sizing and operational offsets are highly institution-dependent.
← SCP-6937 ↑ All SCPs SCP-6939 →