SCP-6984
Unknown
~
medium confidence
SCP-6984
Expected annual
$482K
One-time setup
$426K
Annual recurring
$467K
Personnel
3.0
Estimated one-time setup costs are approximately $426,500 driven by containment retrofit, equipment (autoclave, tanks, freezers) and initial SOP/LIMS work. Recurring annual costs are approximately $467,300 driven primarily by staff wages, research/monitoring, contingency/reserve and waste/utility logistics.
One-Time Capital Costs
Total: $426K
Annual Recurring Costs
Total: $467K/yr
Cost Scenarios
📊
Baseline
(baseline)
$467K/yr
Normal year with routine monitoring, disposal and no major incidents.
routine_sampling_and_analysis
scheduled_maintenance
🚨
Minor Incident
$497K/yr
Short-term containment event or blockage requiring overtime, extra disposal and localized cleanup.
blockage_or_localized_breach
extra_disposal_and_overtime
🚨
Major Breach
$917K/yr
Significant contamination or public exposure requiring extended remediation, legal action, and possible partial decommissioning.
major_contamination
regulatory_involvement
decommissioning_or_site_remediation
🚨
Research Breakthrough Requiring Scale Up
$717K/yr
Discovery that warrants expansion of in-house research capacity and frequent advanced analyses.
novel_anomalous_properties_identified
decision_to_fund_full_research_program
Personnel
3.0 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 0.2 | [#11] Part-time oversight (0.2 FTE) for experimental design, data review and incident consultation. |
| Lab Technician | 0.5 | [#11] 0.5 FTE technician performing weekly sampling, routine assays and specimen handling. |
| Security Officer / MTF Agent | 2 | [#11] Two full-time security personnel assigned to site/containment chamber security. |
| Containment Specialist (on-call) | 0.1 | [#11] On-call containment specialist stipend for incident response and protocol advisement. |
| Engineer / Maintenance (part-time) | 0.2 | [#11] Part-time maintenance support for plumbing, HVAC and mechanical systems tied to SCP-6984. |
Confidence Notes
Analyst notes provide detailed line items and ranges; many estimates are range-based and depend on site reuse of existing facilities, local contractor rates, and the chosen biosafety/prion posture. Unknowns about prion risk and potential decommissioning increase uncertainty.