SCP-7060
Euclid
~
medium confidence
SCP-7060
Expected annual
$4.1M
One-time setup
$6.1M
Annual recurring
$3.9M
Personnel
21
Upfront one-time costs are dominated by site construction, perimeter hardening, and specialized non-human observation systems (~$6.1M). Recurring annual operations (security/payroll, housing/meals, monitoring, legal/PR, reserves) are substantial, roughly $3.9M/yr, driven by personnel and contingency/reserve allocations.
One-Time Capital Costs
Total: $6.1M
Annual Recurring Costs
Total: $3.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.9M/yr
Normal operational year with no major incidents; routine containment and monitoring operations only.
steady-state operations
no accidental human observations
routine maintenance and monitoring
🚨
Minor Incident
$4.4M/yr
Localized accidental human observation or small-scale infrastructure damage requiring targeted response and legal/forensic action.
single accidental human observation of SCP-7060-1
localized casualties or property damage
small-scale PR/legal engagement
🚨
Major Breach
$8.9M/yr
Large-scale containment failure or catastrophic incident across Site-900-B requiring mass casualty response, large reconstruction, settlements and extended operations.
site-wide breach or multiple simultaneous accidental exposures
major storm-driven cascade events (historical in incidents)
significant political or public exposure requiring settlements
Personnel
21 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#4] Posted armed guards for 24/7 perimeter security (estimate based on 8–12 guard range). |
| Security Supervisor | 2 | [#4] Supervisors/guard management to cover shifts and training relief. |
| Control-room Operator / Technical Staff | 6 | [#5] Operators to monitor feeds, manage automated quarantines and site systems (4–8 estimated; mid = 6). |
| Medical Officer / Medical Technician | 2 | [#17] On-site medical staffing for trauma response and administration of medical protocols. |
| Site Director / Administrative Staff | 1 | [#2, #14] Site management and administrative liaison (site director/exec). |
Confidence Notes
Analyst notes provide fairly detailed line items and ranges for infrastructure, staffing and software needs, allowing a reasoned cost build; uncertainty remains in contingency sizing, community settlement exposure, and frequency/magnitude of incidents, so confidence is medium.