SCP-7104
Euclid
~
medium confidence
SCP-7104
Expected annual
$10.2M
One-time setup
$145.3M
Annual recurring
$9.7M
Personnel
24
Estimated one-time capital costs are large due to underground fortified site construction and contingency reserves (~$145.3M total one-time). Recurring annual operations, staffing, maintenance, research, and cover costs drive ongoing expenses (~$9.66M/year).
One-Time Capital Costs
Total: $145.3M
Annual Recurring Costs
Total: $9.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$9.7M/yr
Normal operational year with routine maintenance, research, staffing, and cover operations; no major containment incidents.
no_major_incident
routine_maintenance
normal_research_activity
🚨
Minor Incident
$10.2M/yr
Localized containment event requiring emergency repairs, media suppression, extra field teams, and increased medical/amnestics usage.
localized_structural_failure
small_bio_release
unauthorized_public_contact
🚨
Major Breach
$34.7M/yr
Severe containment failure requiring large-scale remediation, partial relocation, heavy repairs, and extended response operations.
structural_collapse
large_bio_release
off-site_incidents
Personnel
24 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#6] Armed guard positions providing 24/7 coverage; wages included in staff_wages. |
| Security Supervisor | 2 | [#6] Supervisory roles for rotation and rapid-reaction oversight; wages included in staff_wages. |
| Research Scientist / Technical Staff | 10 | [#7] Spatial physicists, structural engineers, xenobiologists, lab technicians, systems engineers and data analysts; wages included in staff_wages. |
Confidence Notes
Many line items are well-defined (construction, staffing, labs), but wide geologic uncertainty, unknown degradation rate, and contingent worst-case events inflate estimation uncertainty; ranges provided by analysts drive medium confidence.