SCP-712
Safe
✓
high confidence
SCP-712
Expected annual
$3.4M
One-time setup
$2.4M
Annual recurring
$3.4M
Personnel
8
One-time setup and capital costs are roughly $2.44M, driven by containment retrofitting and high-end optical diagnostics; recurring annual costs are about $3.35M/yr, driven primarily by dedicated research personnel, covert suppression/legal programs, security, and contingency reserves.
One-Time Capital Costs
Total: $2.4M
Annual Recurring Costs
Total: $3.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.4M/yr
Normal year with routine operations, no major incidents; containment stable and suppression programs operating as planned.
routine_experiments
scheduled_maintenance
ongoing_suppression_activity
🚨
Minor Incident
$3.5M/yr
Localized experimental accident or equipment failure causing damage to optics, temporary shutdown, overtime and small-scale replacements.
equipment_failure
small_containment_breach
uncontrolled_sample_fluorescence
🚨
Major Breach
$5.8M/yr
Significant exposure or public discovery event or large-scale containment failure requiring expensive legal action, large covert operations, major equipment replacement and possible facility remediation.
public_exposure
replication_published_by_independent_lab
large_scale_hardware_damage
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (Senior Optical Physicist) | 2 | [#12] Senior researchers leading experiments and theory ($150k each salary basis included in item #12). |
| Research Scientist (Junior) | 2 | [#12] Junior researchers running day-to-day experiments ($80k each salary basis included in item #12). |
| Lab Technician | 2 | [#12] Lab technicians for experiment setup, maintenance and consumables handling ($70k each salary basis included in item #12). |
| Engineer / Maintenance | 1 | [#12] In-house engineer for mounts, electronics and alignment ($120k salary basis included in item #12). |
| Safety Officer / Compliance Lead | 1 | [#12] Safety/compliance lead for interlocks, PPE and protocol enforcement ($80k salary basis included in item #12). |
Confidence Notes
Analyst notes provide line-item estimates for every cost category with specific dollar figures; containment is Safe-class with well-specified operational and political/legal requirements, so cost ranges are well-defined.