SCP-716
Euclid
~
medium confidence
SCP-716
Expected annual
$4.9M
One-time setup
$22.6M
Annual recurring
$4.8M
Personnel
25
Initial capital outlay is large due to a bespoke reinforced containment structure, heavy lead shielding, specialized anchors and recovery vehicles (~$22.6M one-time). Main annual costs are staffing, research/monitoring, replacement of shielding and readiness (~$4.5M/yr).
One-Time Capital Costs
Total: $22.6M
Annual Recurring Costs
Total: $4.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.8M/yr
Normal year with no major containment incidents; routine operations and scheduled maintenance only.
no_breach
routine_maintenance
scheduled_research
🚨
Minor Incident
$4.8M/yr
Localized breach or single recovery deployment requiring sterilization, a small recovery team deployment and modest legal/compensation costs.
single_recovery_deployment
localized_sterilization
small_legal_payouts
🚨
Major Breach
$7.0M/yr
Significant containment failure requiring multiple large sterilization events, extensive recovery operations, infrastructure repair and major legal/relocation expenses.
widespread_decontamination
multiple_recovery_ops
evacuation_or_relocation
Personnel
25 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 14 | [#8] 24/7 armed guard force (example: 4per shift × 3 shifts + supervisors); included in staff_wages estimate. |
| Engineer / Maintenance | 5 | [#9] Containment engineers and technicians for shielding, anchors, doors and structural repairs; included in staff_wages. |
| Hazmat / Biosafety Technician | 4 | [#10] Hazmat and biosafety operational staff for sterilization and decontamination procedures; included in staff_wages. |
| Medical Officer | 1 | [#11] Medical surveillance program lead/contact for staff health monitoring; partial wage included in staff_wages. |
| Administrative Staff / Site Coordinator | 1 | [#22] Administrative and approvals support (ethical oversight, documentation); wage included in staff_wages. |
Confidence Notes
Analyst notes provide detailed line-item ranges enabling mid-range estimates, but uncertainty remains in per-event frequencies, shielding replacement cadence and location-dependent land/acquisition costs; anomalous behaviors could greatly increase costs.