SCP-7181
Unknown
~
medium confidence
SCP-7181
Expected annual
$8.3M
One-time setup
$24.8M
Annual recurring
$8.1M
Personnel
23
Estimated one-time capital costs are approximately $24,770,000 driven primarily by secure containment construction, specialized robotics and instrumentation, and lab buildout; recurring baseline operating costs are approximately $8,090,000/year driven by staff wages, ongoing research programs, robotics operations, and cover/opsec expenditures.
One-Time Capital Costs
Total: $24.8M
Annual Recurring Costs
Total: $8.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.1M/yr
Normal operational year with routine missions, scheduled maintenance, and no major incidents.
routine_operations
scheduled_maintenance
no_breach_events
🚨
Minor Incident
$8.6M/yr
Localized equipment failures, loss of a rover, or small contamination event requiring moderate repairs and replacements.
robotic_loss
equipment_failure
localized_contamination
🚨
Major Breach
$13.1M/yr
Significant accident, major equipment destruction, or highly visible incident requiring large-scale recovery, legal/cover operations, and contingency fund drawdown.
accidental_live_return
major_equipment_loss
external_exposure_requiring_OPSEC_response
Personnel
23 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#5] Armed guards covering 24/7 shifts (three 8-hour shifts), access control and rapid-response personnel. |
| Research Scientist | 8 | [#6, #14, #26] Transdimensional physicists, geochemists, exo-environmental specialists and instrument PIs supporting monitoring and long-term research. |
| Medical Officer | 3 | [#7] On-site medics, triage and long-term monitoring staff for exposure and casualty care. |
| Administrative Staff / Site Director | 2 | [#23, #30] Site director/executive and admin support for logistics, records, and clearance management. |
Confidence Notes
Analyst notes provide wide cost ranges and many assumptions (mission frequency, degree of automation, secrecy level). Estimates use mid-range selections and explicit allocations for split items; significant uncertainty remains around mission cadence and extreme-event costs, so confidence is medium.