SCP-7210
Unknown
~
medium confidence
SCP-7210
Expected annual
$3.1M
One-time setup
$2.6M
Annual recurring
$3.1M
Personnel
20
Initial capital and R&D costs are substantial (~$2.64M one-time) driven by bespoke R&D, secure lab buildout, and specialized containment upgrades; ongoing annual operations are dominated by staff salaries, research operations, and contingency (~$3.08M/year).
One-Time Capital Costs
Total: $2.6M
Annual Recurring Costs
Total: $3.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.1M/yr
Normal year with scheduled research, monitoring, and no major incidents.
routine_operations
scheduled_research_and_maintenance
🚨
Minor Incident
$3.3M/yr
Localized incident: star-count mismatch or brief seal failure causing limited ingress attempts, minor equipment damage, and short-term increased monitoring and legal activity.
star-count_mismatch
local_equipment_failure
brief_unsealing
🚨
Major Breach
$4.6M/yr
Major containment breach or public exposure requiring MTF deployment, facility repairs/rebuild, deep forensic research response, and significant cover-up/legal expenditures.
full_breach_and_escape
public_exposure
extensive_equipment_failure
Personnel
20 total
| Role | Count | Notes |
|---|---|---|
| Surveillance Operator / Monitoring | 8 | [#8] 24/7 monitoring staff: 2per shift × 3 shifts + supervisor/backups (~8 FTEs) as specified in notes. |
| Research Scientist | 6 | [#20] Research-team (scientists/postdocs/engineers) estimated at ~6 FTEs covered under research-team salaries. |
| Algorithm / Software Engineer | 2 | [#11, #12, #22] Personnel to operate and maintain celestial-imaging algorithms and ML pipelines; included in algorithm ops & compute budgets. |
| Anomaly Health & Psychology Committee (Psychologist) | 3 | [#18] AH&P staff (2–4 specialists) and program funds to manage SCP-7210 mental health and compliance; mid-range of 3 chosen. |
| Medical Officer | 1 | [#17] On-call medical readiness and burn-response capability (on-call / part-time coverage included in recurring medical budget). |
Confidence Notes
Analyst notes provide detailed line items and ranges for most costs, enabling a mid-confidence estimate; uncertainty remains around optional probing programs (item #24), R&D outcomes, and real-world incident probabilities which makes precise long-term forecasting harder.