SCP-7212 Euclid ~ medium confidence
SCP-7212
Expected annual
$2.7M
One-time setup
$2.0M
Annual recurring
$2.7M
Personnel
22
Estimated one-time capital costs are approximately $2.03M driven by cold-room construction, monitoring hardware, civil mitigation and disposal setup; recurring annual costs are approximately $2.70M/yr driven mainly by security staffing, MTF readiness, research staff and administrative overhead.
🏗️ One-Time Capital Costs Total: $2.0M
Land Acquisition And Visual Concealment $500K
[#12] Visual concealment, screening, berms, fencing, or purchase/easement of adjacent land to obscure/permanently control views of SCP-7212-A (one-time capital; scalable).
Equipment $383K
[#2, #8, #9, #10, #23] Redundant refrigeration/HVAC commissioning, CCTV/sensor network installation, initial data-server hardware, drone/LiDAR equipment, and communications/audio capture equipment (installation and initial calibration/hardware).
Facilities $375K
[#1, #11] Cold containment 'office' construction and perimeter reinforcement/survey (insulation, interior finish, structural works and reinforcement design/initial works).
Initial Research And Lab Setup $325K
[#15] Pathology/autopsy lab upgrade and specialized diagnostic equipment (mass spec, sequencer, imaging, PPE lab fixtures) initial purchase and setup.
Emergency Disposal Setup $275K
[#21] One-time setup for large-scale biological disposal capacity (temporary containment infrastructure, incineration/neutralization contracts or equipment).
Backup Generator Purchase $80K
[#4] Purchase/installation of backup generator and UPS sized for continuous refrigeration + monitoring (ONE-TIME purchase).
Autoclave Purchase $35K
[#16] Autoclave purchase for sterilization and instrument decontamination (ONE-TIME).
Legal Setup $30K
[#14] One-time legal/setup fees, permits and initial liaison retainer (ONE-TIME).
Training And Sop Development $25K
[#22] Initial SOP development, memetic-safety review and initial training program development (ONE-TIME initial component).
🔄 Annual Recurring Costs Total: $2.7M/yr
Staff Wages $890K/yr
[#5, #6, #19] On-site security (6 guards), perimeter security (4 guards) and research staffing (2 researchers + 2 technicians) annual salaries/benefits.
Mtf Readiness $800K/yr
[#7] Dedicated rapid-response / containment task force readiness costs (standby pay, training, specialized equipment).
Administrative Overhead And Contingency $449K/yr
[#25] Institutional overhead (HR/finance/procurement) and contingency reserve (estimated ~20% of direct recurring operational costs).
Cover Story And Legal $140K/yr
[#13, #14] Public cover budget, field amnestics, PR/cleanup set-aside and ongoing legal/governmental liaison fees (recurring).
Heavy Equipment Contract $100K/yr
[#20] Standby contract/retainer for heavy-lift cranes, removal and mass-removal plan (annual retainer).
Psychological Services $97K/yr
[#18] Counseling services and extra staffing/rotation costs to mitigate stress and memetic risks (counseling + rotation staffing load).
Supplies And Consumables $80K/yr
[#15, #16, #17] Pathology consumables, PPE, biohazard disposals, sanitation and cleaning operations (consumables, disposals, PPE replacement).
Logistics And Transport $40K/yr
[#24] Road/site-access maintenance and vehicle fleet upkeep for sensor servicing and staff/equipment transport.
Drones Ops $35K/yr
[#10] Drone/LiDAR/aerial survey operational costs, insurance, training and communications.
Training And Drills $15K/yr
[#22] Annual refresher training, drills, SOP sign-offs and memetic-safety reviews.
Backup Generator Fuel Maintenance $14K/yr
[#4] Annual fuel and maintenance contract for backup generator/UPS.
Facilities Maintenance $12K/yr
[#3] Continuous energy and routine HVAC/refrigeration maintenance and seasonal service contracts (~electricity and routine maintenance).
Sensors Maintenance $12K/yr
[#8] Annual maintenance, calibration and ops for CCTV/thermal/acoustic/seismic sensor network.
Data Storage Ops $6K/yr
[#9] Long-term data storage, backup operations, and minimal ops for analyst access (recurring storage/ops).
Communications Maintenance $6K/yr
[#23] Maintenance and minor repairs for secure comms, audio capture and archival equipment.
Research And Monitoring $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $2.7M/yr
88.0% probability / year
Normal, uneventful year with routine monitoring, maintenance, staffing and planned consumables with no major incidents.
no_breach routine_monitoring scheduled_maintenance
🚨 Minor Incident $2.9M/yr
10.0% probability / year +$200K vs baseline
Localized containment event or limited SCP-7212-A disturbance requiring MTF response, short-term heavy-equipment use, increased amnestic/PR activity and repair.
localized_breach sensor_alerts increased_vocalisation_or_public_sightings
🚨 Major Breach $3.9M/yr
2.0% probability / year +$1.2M vs baseline
Significant multi-unit movement/collapse or large-scale public exposure requiring extended MTF operations, mass removal/disposal, legal exposure costs and major site repairs.
mass_collapse widespread_public_exposure extended_containment_failure
👥 Personnel 22 total
Role Count Notes
Security Officer / Guard 10 [#5, #6] 6 on-site containment guards + 4 perimeter guards (continuous 24/7 coverage across shifts).
Rapid Response / MTF Agent 8 [#7] Dedicated rapid-response team (on-call/standby force for incidents; 6–12 personnel range; midpoint used).
Research Scientist 2 [#19] Assigned researchers dedicated to SCP-7212 monitoring and analysis.
Research Technician 2 [#19] Technicians supporting monitoring, sample handling and sensor operations.
📋 Confidence Notes
Estimates are medium confidence: line-item ranges are well-identified but many items (land acquisition, MTF posture, and disposal scale) vary widely by site and scenario, producing substantial uncertainty in totals.
← SCP-7211 ↑ All SCPs SCP-7213 →