SCP-7218 Euclid ~ medium confidence
SCP-7218
Expected annual
$2.9M
One-time setup
$3.4M
Annual recurring
$2.8M
Personnel
24
Initial one-time containment and setup estimated at $3,235,000, driven by site acquisition, perimeter/hardening and contingency reserves; ongoing annual costs ~ $2,809,000 driven primarily by staff wages, research operations, QRT readiness and legal/cover-story operations.
🏗️ One-Time Capital Costs Total: $3.4M
Facilities $1.2M
[#1, #2, #3] Site acquisition/title transfer and municipal control (#1), perimeter fortification (#2), and physical hardening of access points (doors/windows/entry systems) (#3). Estimate combines covert acquisition and structural work.
Compensation Settlements $500K
[#16] Contingent settlement/hush payments or initial litigation settlements (one-time planning allocation; highly variable).
Emergency Contingency Fund $500K
[#23] Reserve fund for unforeseen one-time expenditures (replace failed kit, emergency recoveries, litigation spikes).
Initial Research And Lab Setup $200K
[#20] Seed funding for specialized mitigation research and initial lab research instrumentation; separated from recurring research budgets.
Research Seed Funding $200K
[#20] One-time tranche for targeted mitigation experiments, initial prototypes and feasibility studies.
Demolition And Risk Study $185K
[#21] Controlled-demolition cost estimate and environmental remediation planning plus risk assessment study (one-time contingency if chosen).
Remote Sensing Infra $150K
[#8] High-sensitivity receivers, spectrum analyzers, antennas and hardened recorders (one-time procurement and installation).
Transmitters Development $125K
[#9] Development and procurement of ruggedized transmitters/trackers/power-packs for testing and subject instrumentation (one-time development/procurement).
Background Checks $90K
[#18] Upfront comprehensive vetting, clearances and polygraphs for initial staff cohort (~30 people).
Qrt Vehicles $80K
[#7] Two rugged response vehicles and initial outfitting for QRT.
Surveillance Installation $72K
[#4] CCTV/thermal/tamper sensor hardware and installation (one-time hardware + install).
Legal Closing Fees $42K
[#15] Immediate legal/municipal closing fees, initial payments to secure control/cover (one-time).
Artifact Relocation Move $30K
[#19] Secure removal, cataloging and transit of museum exhibits for archive/study (one-time move/catalog cost).
Servers Nvr $25K
[#12] Ruggedized on-site servers/NVR for continuous video/audio capture (one-time purchase).
Power Infrastructure $25K
[#13] Backup generator, ATS and initial power hardening (one-time purchase/installation).
Equipment $0
[]
🔄 Annual Recurring Costs Total: $2.8M/yr
Staff Wages $1.5M/yr
[#5, #6, #10] Salaries/benefits for continuous monitoring staff (~6 FTE), armed security (~6 FTE) and core research staff (4–8, modeled here as 6 FTE). Does not include QRT operating/training line-item (separate).
Research And Monitoring $325K/yr
[#10, #20] Non‑wage research operating costs: lab consumables, small specialized instruments, and ongoing mitigation research program funding.
Cover Story And Legal $260K/yr
[#15, #22] Ongoing legal fees, municipal relations, FOIA counters, PR/cover-story operations and relocation assistance to keep civilians away.
Logistics And Transport $235K/yr
[#11, #19] D‑Class program housing/security/logistics contingency (#11) and ongoing secure storage costs for relocated artifacts/evidence (#19).
Qrt Operations $225K/yr
[#7] QRT recurring costs: salaries/training/ammunition, comms and readiness for rapid containment response.
Contingency Top Up $50K/yr
[#23] Annual top-ups to the emergency contingency reserve to ensure readiness.
Facilities Maintenance $46K/yr
[#13, #14] Utilities (electricity/HVAC/water), groundskeeping and backup generator fuel & maintenance.
Servers Backup Storage $35K/yr
[#12] Off-site backups, cloud archival fees and storage media rotation for continuous high-resolution video/audio/spectrum logs.
Remote Sensing Maintenance $30K/yr
[#8] Maintenance, calibration and satellite/uplink service fees for remote sensing and telemetry infrastructure.
Psychological Support $30K/yr
[#17] Counseling, medical monitoring and staff care programs for personnel.
Long Term Archival $30K/yr
[#25] Secure long‑term retention of logs, video archives and legal/operational records.
Training Drills $25K/yr
[#24] Annual training, breach drills and procedural updates for security and research staff.
Clearance Renewal $20K/yr
[#18] Periodic re‑clearance, polygraphs and administrative vetting renewals.
Transmitters Replaceables $12K/yr
[#9] Consumable/replaceable transmitters, batteries and field kit replacements.
Surveillance Maintenance $10K/yr
[#4] Annual maintenance/calibration and service contracts for CCTV/thermal/tamper sensors.
Supplies And Consumables $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $2.8M/yr
78.0% probability / year
Normal year with routine operations and no major incidents.
routine_operations scheduled_research regular_maintenance
🚨 Minor Incident $3.1M/yr
20.0% probability / year +$300K vs baseline
Small breach / equipment failure requiring recovery, limited legal work and replacement of hardware.
small_breach equipment_failure limited_public_exposure
🚨 Major Breach $4.3M/yr
2.0% probability / year +$1.5M vs baseline
Significant containment breach with media exposure, multiple recoveries, large legal actions and possible demolition/major remediation.
major_breach multiple_missing_persons significant_media_exposure
👥 Personnel 24 total
Role Count Notes
Surveillance Operator 6 [#5] Continuous 24/7 monitoring across three shifts; costed in staff_wages.
Security Officer / MTF Agent 6 [#6] Armed perimeter patrols and on-site security; costed in staff_wages.
Research Scientist 6 [#10] Dedicated anomalous-phenomena researchers and analysts; salaries reflected across staff_wages and research budgets.
Quick Reaction Team / Containment Response Team 6 [#7] Tactical response personnel assigned to rapid containment and recovery; recurring QRT ops budget covers salaries/training.
📋 Confidence Notes
Analyst notes provide detailed line items and ranges, allowing a reasoned estimate, but major uncertainties remain (legal settlements, demolition choices, long-term mitigation research outcomes and variability in municipal acquisition). This yields medium confidence.
← SCP-7217 ↑ All SCPs SCP-7219 →