SCP-7278
Unknown
?
low confidence
SCP-7278
Expected annual
$1.1M
One-time setup
$1.3M
Annual recurring
$1.1M
Personnel
10
Initial setup requires a one-time investment for a reinforced containment chamber, shielding, ritual lab setup and large contingency reserves (~$1.27M total one-time). Annual operations are driven by staffed security/research payrolls, thaumaturgical consulting, field intelligence and discretionary budgets (~$1.05M/yr).
One-Time Capital Costs
Total: $1.3M
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal year with no major incidents; operations run at planned staffing and consultant levels.
no incidents
routine testing only
🚨
Minor Incident
$1.2M/yr
Localized incident requiring site lockdown, targeted medical response, repairs and limited external consultancy.
localized mechanical failure
staff memetic exposure requiring screening
minor public exposure contained quickly
🚨
Major Breach
$1.9M/yr
Significant containment failure or public/international exposure requiring large mobilization, neutralization attempt, major legal/diplomatic action.
conceptual cascade / widespread memetic effects
public disclosure / international diplomatic incident
requirement for neutralization operation
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | Dedicated 24/7 coverage, two guards per shift (3 shifts); fully‑loaded ~$50,000/yr each [#6]. |
| Research Scientist (Senior) | 1 | Senior researcher for anomalous/mechanical study; salary ~$150,000/yr [#7]. |
| Research Assistant | 1 | Technical support for experiments; salary ~$80,000/yr [#7]. |
| Miscommunications Specialist | 1 | Manages memetic/miscommunication hazards and test protocols; salary ~$140,000/yr [#7]. |
| Redaction Staff | 1 | Part‑time redaction and archival handling for memetic‑resilient documentation; ~$8,000/yr [#12]. |
Confidence Notes
Estimates are based on analyst line items but the 'definitionally compromised' nature of SCP‑7278 introduces significant epistemic uncertainty; contingency and consultant estimates are large approximations and actual costs could vary widely.