SCP-7347
Unknown
?
low confidence
SCP-7347
Expected annual
$165.0M
One-time setup
$4.5B
Annual recurring
$158.0M
Personnel
250
Estimated one-time setup and construction costs ~ $4.55B driven primarily by super-deep drilling, subsurface stabilization, and a large anomalous contingency; annual operating costs are ~ $158M driven by staff wages, power/thermal operations, and ongoing research/monitoring.
One-Time Capital Costs
Total: $4.5B
Annual Recurring Costs
Total: $158.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$158.0M/yr
Normal operational year with scheduled maintenance, research activity, and no major incidents.
normal_operations
scheduled_maintenance
routine_research
🚨
Minor Incident
$178.0M/yr
Localized borehole instability, sensor loss, small downhole failure or limited environmental contamination requiring repair and limited remediation.
localized_borehole_instability
instrument_failure
limited_anomalous_activity
🚨
Major Breach
$658.0M/yr
Severe borehole collapse, uncontrolled anomalous activation or large-scale environmental/containment failure requiring major remediation, asset replacement and emergency response.
borehole_collapse
uncontrolled_anomalous_activity
mass_evacuations
Personnel
250 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 60 | [#14, #15] Lab and analysis staff for materials, xenobiology, physics and instrument interpretation. |
| Engineer / Maintenance | 50 | [#4, #5, #6, #15] Drilling, tunnelling, thermal systems and structural engineers plus maintenance crews. |
| Security Officer / MTF Agent | 40 | [#16, #15] Site security, perimeter control, and rapid-response tactical teams. |
| Technician / Field Tech | 30 | [#10, #11, #15] Field technicians for sensors, downhole instruments, and routine maintenance. |
| Specialist Operators (drill/ROV/pilots) | 20 | [#5, #10, #17] Operators for deep-drill rigs, ROVs/UGVs and heavy-lift support. |
| Logistics / Pilots / Aviation crew | 8 | [#17, #18] Aviation and logistics personnel for airlift and cargo handling. |
| Medical Officer | 5 | [#20] On-site medical, decontamination and occupational health staff. |
| Administrative Staff | 10 | [#2, #21] Site admin, finance, and cover-story management personnel. |
| IT & Communications | 10 | [#19] Secure communications, data management and IT operations staff. |
| Site Director / Executive Staff | 2 | [#21, #15] Senior leadership and program directors. |
| Contractor / Legal / PR Liaisons | 5 | [#2, #21, #22] External contractors, legal counsel and PR/cover operatives. |
| Maintenance Support (seasonal/auxiliary) | 10 | [#7, #18] Auxiliary crews for high-altitude construction, seasonal access and infrastructure upkeep. |
Confidence Notes
Estimates are low-confidence due to extreme technical uncertainty (17 km access beyond civilian precedent), wide cost ranges provided in source notes, Swiss jurisdiction/covert requirements, and potentially open-ended anomalous-specific needs (large contingency included).