SCP-738
Keter
~
medium confidence
SCP-738
Expected annual
$4.6M
One-time setup
$15.5M
Annual recurring
$4.5M
Personnel
21
Initial capital outlay is large (~$15.5M) driven by hardened containment chambers, crisis reserve, and heavy equipment (robotics, secure IT/surveillance, vehicles). Recurring annual operations are substantial (~$4.48M/yr) driven by staff wages (engineers, armed guards, researchers), Class D management, legal/cover-up, maintenance and monitoring.
One-Time Capital Costs
Total: $15.5M
Annual Recurring Costs
Total: $4.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.5M/yr
Normal uneventful year with no major containment incidents; routine operations, maintenance, staffing and monitoring only.
no incidents
routine maintenance
standard research schedule
🚨
Minor Incident
$4.8M/yr
Single containment-related incident (engineer collar detonation or shaped-charge use) requiring repairs, replacement ordnance, and forensic cleanup.
engineer collar detonation
shaped-charge deployment
localized mechanical failure
🚨
Major Breach
$7.5M/yr
Significant containment failure causing multiple casualties, heavy structural damage, large-scale repairs and substantial legal/cover-up costs.
multi-person breach
structural damage to chambers
extensive forensic and repair operations
🚨
Political Exposure
$9.5M/yr
Public exposure or legal/political escalation requiring full crisis reserve deployment, major legal operations, and reputational containment.
public leak / major media exposure
external legal action
large-scale corruption/cover-up operations
Personnel
21 total
| Role | Count | Notes |
|---|---|---|
| Engineer / Maintenance | 2 | [#6] Dedicated engineers certified for hazardous collar-entry, mechanical system maintenance and on-call resets. |
| Security Officer / MTF Agent | 15 | [#8] Armed guards for 24/7 chamber postings, rapid response teams and perimeter coverage (modeled as 15 FTEs to match wage estimate). |
| Research Scientist | 4 | [#10] PSI researchers, linguists, psychologists and note-takers (core team of 3-6 FTEs; modeled here as 4 FTEs). |
Confidence Notes
Many line items (facility hardening, frequency of shaped-charge/collar use, and legal/cover-up needs) have wide ranges; capital and recurring estimates use the analyst's 'best' figures where available, but event-driven costs remain uncertain.