SCP-7401
Unknown
?
low confidence
SCP-7401
Expected annual
$687K
One-time setup
$1.9M
Annual recurring
$642K
Personnel
4
One-time capital/setup costs are estimated at $1,936,000 driven by secure containment, research instrumentation (micro-CT) and contingency reserves; recurring annual operating costs are estimated at $642,000 driven mainly by staff wages, facility readiness/overhead, external consultancy and opportunity costs.
One-Time Capital Costs
Total: $1.9M
Annual Recurring Costs
Total: $642K/yr
Cost Scenarios
📊
Baseline
(baseline)
$642K/yr
Normal year with scheduled operations, routine maintenance, training and no major incidents.
routine_training_sessions
scheduled_maintenance
no_incidents
🚨
Minor Incident
$792K/yr
Localized incident requiring repairs, additional medical care, extra imaging and short-term consultancy.
equipment_malfunction
limited_exposure_event
additional_repairs_or_scans
🚨
Major Breach
$2.1M/yr
Significant containment failure or external exposure requiring major response, replacement, legal action and potential decommissioning.
containment_breach
facility_wide_effects
public_exposure_or_legal_crisis
Personnel
4 total
| Role | Count | Notes |
|---|---|---|
| Instructor / Training Staff | 1 | [#10, #11] Full-time or lead instructor to run the Experimental Administrative Tech Interface Training program; ongoing salary cost included in staff_wages. |
| Research Scientist / Technician (supervising) | 2 | [#13] One-to-two supervising researchers/technicians required per authorized session; staffing hours budgeted in staff_wages. |
| Safety Officer / Medic | 1 | [#13, #17] On-call safety officer/medic for sessions and post-session monitoring; included in per-session staffing costs in staff_wages. |
| Containment Technician | 0 | [] Containment technician-longer-term FTE not separately budgeted beyond session staffing and technicians above; included as reallocated staff-hours in staff_wages. |
Confidence Notes
Estimates are low-confidence due to the paratechnical nature of SCP-7401, wide cost ranges in analyst notes, unknown incident frequency/severity and optional choices (vehicle purchase, buy vs contract imaging). Figures use mid-range assumptions and explicit budgeting choices.