SCP-7419
Safe
~
medium confidence
SCP-7419
Expected annual
$250K
One-time setup
$164K
Annual recurring
$241K
Personnel
2.0
Initial one-time setup is estimated at approximately $164,300, driven mainly by building an air-gapped test enclosure, Faraday/EM hardening, and development of an offline keyword-spotter and kill-relay. Annual recurring costs are estimated at ~$241,450/year, driven by personnel wages, anomalous-repair/replacement budget, long-term research allocation, and security/administration.
One-Time Capital Costs
Total: $164K
Annual Recurring Costs
Total: $241K/yr
Cost Scenarios
📊
Baseline
(baseline)
$241K/yr
Normal uneventful year with routine testing and expected maintenance/replacements only.
scheduled tests performed under SOP
no major incidents or public exposure
🚨
Minor Incident
$251K/yr
One-off elevated destructive event (extra testing or accidental simultaneous run) requiring extra replacement/repair and limited investigation.
unexpected extra destructive test
single serious equipment failure beyond routine repair
🚨
Major Breach
$341K/yr
Multiple-device destruction, extended investigation, significant replacements, and elevated security upgrades.
mass testing or cascade failures
significant loss of research hardware
🚨
Political Exposure
$491K/yr
External leak/public exposure requiring heavy PR/legal action, accelerated replacements, and containment hardening.
public leak of outputs
legal/PR incident requiring external work
Personnel
2.0 total
| Role | Count | Notes |
|---|---|---|
| Research Technician / Lab Technician | 1 | [#10] One full-time technician to perform tests, supervise kill-switches, and maintain logs (covered by staff_wages). |
| Security Officer | 0.5 | [#11] Part-time / 0.5 FTE equivalent for storage/test-area access control and escorted transport (covered by security_staffing). |
| Research Scientist (part-time) | 0.5 | [#23] Part-time research oversight funded by the long-term research allocation (covers project work, analysis, and protocol design). |
Confidence Notes
Analyst notes are detailed and provide ranges for each line item, but many costs depend heavily on testing frequency, repair/replacement rates for anomalous units, and policy choices (e.g., security staffing model, retainer levels). Midpoint estimates were used where ranges existed; this yields moderate confidence.