SCP-7484
Euclid
~
medium confidence
SCP-7484
Expected annual
$14.2M
One-time setup
$23.3M
Annual recurring
$13.5M
Personnel
38
Up-front capital is ~ $23.3M driven by bespoke sunken playpen construction, autonomous vehicle fleet procurement, control room and software development; recurring annual costs are ~ $13.54M driven by staffing (security, operators, researchers), liaison network, legal/cover reserves and contingency funds.
One-Time Capital Costs
Total: $23.3M
Annual Recurring Costs
Total: $13.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$13.5M/yr
Normal year with scheduled operations, regular research, staffing and reserves; no major incidents.
no significant manifestations outside site
routine maintenance and training only
🚨
Minor Incident
$16.3M/yr
Localized incident requiring emergency legal/amnestic response, limited settlements, short-term fleet/prop replacements and extra cleanup.
visible civilian property damage
small number of injuries or exposure incidents
🚨
Major Breach
$25.5M/yr
Large adverse year with civilian casualties, expensive legal settlements, media exposure and rapid expansion of liaison/response resources.
civilian fatalities or high-profile incident
multi-jurisdiction manifestations and media exposure
Personnel
38 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 16 | [#13] 24/7 site guards, armed response capability and supervisors (salary assumptions ~ $40k–$45k each). |
| Remote Vehicle Operator | 8 | [#14] Trained operators for remote piloting/override and emergency manual control (6–12 operators range). |
| Research Scientist | 8 | [#15] Behavioral, forensic and vehicle-engineering researchers and technicians (6–10 staff range). |
| Engineer / Maintenance | 6 | [#16] Mechanical/robotics technicians for vehicle and infrastructure maintenance (4–8 technicians). |
Confidence Notes
Analyst notes provide many line items and ranges enabling a reasoned estimate, but frequent wide ranges and high incident-dependence (legal settlements, liaison scale, casualty frequency) produce material uncertainty in recurring and scenario costs.