SCP-7490
Unknown
~
medium confidence
SCP-7490
Expected annual
$4.7M
One-time setup
$26.4M
Annual recurring
$4.2M
Personnel
14.2
Initial capital costs are dominated by SRA procurement and specialized containment construction (~$26.4M one-time); ongoing annual operations (security, research, SRA maintenance, energy, monitoring) are estimated at ~$4.24M/yr, with contingency reserves and R&D driving variability.
One-Time Capital Costs
Total: $26.4M
Annual Recurring Costs
Total: $4.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.2M/yr
Normal year with routine maintenance, scheduled testing, and no major incidents.
routine_operations
scheduled_tests
no_incidents
🚨
Minor Incident
$4.7M/yr
Localized equipment failure or small containment incident requiring rapid SRA swap, repairs and limited medical response.
single_SRA_failure
localized_repair
limited_medical_response
🚨
Major Breach
$7.2M/yr
Significant radius escalation or multi-system failure requiring contingency reserve, site repairs, extended medical treatment and operational disruption.
site_wide_radius_expansion
multiple_system_failures
extended_repairs
🚨
Catastrophic Breach
$19.2M/yr
Rare catastrophic event causing widespread infrastructure damage, public exposure and major legal/crisis response.
site_scale_collapse
public_exposure
mass_casualties
Personnel
14.2 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 10 | [#6] 24/7 adjacent containment coverage; rotation across three shifts (8–12 FTE range; 10 assumed). |
| Research Scientist | 2 | [#15] PI and assistant researcher dedicated to SCP-7490 analysis and testing oversight. |
| Technician | 2 | [#15] Supporting technicians for instrumentation, sensors and tests. |
| Psychologist / Medical Officer | 0.2 | [#14] Weekly psychologist sessions roughly 0.2 FTE; additional on-call medical monitoring included in medical budget. |
Confidence Notes
Analyst notes provide detailed line-item ranges allowing an informed estimate, but the anomalous and unpredictable nature of SCP-7490 (variable radius, potential site-wide escalation) creates wide uncertainty ranges for hardware counts, reserve sizing and scenario probabilities.