SCP-7507
Euclid
~
medium confidence
SCP-7507
Expected annual
$1.9M
One-time setup
$4.5M
Annual recurring
$1.8M
Personnel
10
One-time setup and potential R&D/Bio‑containment upgrades drive capital costs (~$4.54M one-time). Annual operations are dominated by staff wages, dedicated research and incident contingency, yielding ~ $1.83M/year.
One-Time Capital Costs
Total: $4.5M
Annual Recurring Costs
Total: $1.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.8M/yr
Normal operational year with routine Shifts and no major incidents; all recurring programs and contingencies maintained.
scheduled free-roam/Shift events
routine maintenance and monitoring
🚨
Minor Incident
$1.9M/yr
Localized equipment loss or damaged sensors during a Shift requiring replacements and limited overtime response.
loss of tracking device(s)
sensor/drone damage during Shift
🚨
Major Breach
$2.3M/yr
A Shift results in a significant cross-site recovery, legal exposure, or contaminated material return requiring large-scale response and temporary containment expansion.
dangerous material returned
multi-site retrieval or public exposure
🚨
Neutralization And Cremation
$2.0M/yr
Neutralization or death of the subject leading to one-time cremation, travel of remains and associated legal/cover operations.
neutralization event
O5-approved cremation and transport
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#6] Four guards to provide continuous accompaniment during free-roam (rotation and leave coverage). |
| Security Supervisor / Level-3 oversight | 1 | [#7] Senior security/Level-3 oversight for protocol compliance and incident escalation. |
| Research Scientist | 3 | [#20] Core research staff (physicists/cognitive scientists) included in the research salary pool. |
| Research Technician | 1 | [#20] Technician support for experiments, sensors and sample handling. |
| IT Analyst (part-time) | 1 | [#19] Part-time analyst supporting CCTV review and data storage/analysis (hours budgeted within staff_wages). |
Confidence Notes
Analyst notes provide detailed line-item ranges for most costs (salaries, equipment, contingencies), giving moderate confidence. Large uncertainties remain for R&D (tracking persistence), BSL upgrade scope and extreme-recovery R&D, which dominate one-time variance.