SCP-7529
Unknown
~
medium confidence
SCP-7529
Expected annual
$146K
One-time setup
$373K
Annual recurring
$114K
Personnel
0.75
Initial capital/setup costs are moderate-to-high depending on whether an aviary upgrade or dedicated containment suite is chosen, with baseline annual operating costs driven by part-time monitoring, ongoing veterinary care, janitorial/biocleaning, and recurring research. A low-probability unification event could produce catastrophic, extremely high costs far beyond routine budgets.
One-Time Capital Costs
Total: $373K
Annual Recurring Costs
Total: $114K/yr
Cost Scenarios
📊
Baseline
(baseline)
$114K/yr
Normal year with routine monitoring, veterinary care, janitorial, minor equipment maintenance, and ongoing research at planned levels.
regular_monitoring
scheduled_vet_checkups
routine_research
🚨
Minor Incident
$124K/yr
Non-catastrophic incidents such as fall-related emergency vet visits, small equipment/furnishing damage, or aviary disturbances requiring remediation.
fall_injury_requiring_emergency_vet
minor_property_damage
aviary_disturbance
🚨
Containment Escalation Relocation
$414K/yr
Repeated incidents, stress on avian populations, or new anomalous behaviors force construction or transfer to a dedicated containment module.
repeated_incidents
new_anomalous_behavior
avian_population_impact
🚨
Unification Event
$50.1M/yr
Unification with another SCP-(7)529 component triggers a KOT-Class scenario with wide-ranging ecological, temporal, and infrastructural impacts requiring massive Foundation response.
unification_with_front_half
unsupervised_contact_with_other_halves
Personnel
0.75 total
| Role | Count | Notes |
|---|---|---|
| Animal Monitor | 0.5 | [#4] Part-time animal monitor (0.5 FTE) responsible for supervision during working hours. |
| Handler / Volunteer (stipend) | 0.25 | [#17] Supervised interaction allowance or stipend approximating 0.25 FTE to compensate handlers and prevent misbehavior. |
Confidence Notes
Many routine costs (monitoring, veterinary care, janitorial, basic hardware) are well-scoped from notes, supporting medium confidence; large capital contingencies and catastrophic/unification outcomes are highly speculative, increasing uncertainty in long-tail expected costs.