SCP-7539
Euclid
~
medium confidence
SCP-7539
Expected annual
$2.9M
One-time setup
$4.1M
Annual recurring
$2.8M
Personnel
20
One-time capital to build a specialized containment bay, feeding hydraulics, ventilation and lab equipment is roughly $4.14M; annual operations are dominated by staff/security payroll and weekly bus procurement/disposal at about $2.83M/yr.
One-Time Capital Costs
Total: $4.1M
Annual Recurring Costs
Total: $2.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.8M/yr
Normal operational year with regular weekly feeding, routine maintenance, and no major incidents.
scheduled_feeding
routine_maintenance
no_breach
🚨
Minor Incident
$3.1M/yr
Localized leak, small-scale contamination, or equipment failure requiring remediation and increased legal/PR activity.
chemical_leak
small_equipment_failure
minor_public_inquiry
🚨
Major Breach
$4.3M/yr
Significant containment breach or public exposure resulting in large-scale remediation, legal settlements, and extended operations disruption.
containment_breach
public_exposure
major_environmental_remediation
🚨
Unexpected Reproduction
$4.3M/yr
SCP reproduces or an additional specimen must be maintained, requiring immediate expansion of containment capacity and additional recurring feeds.
specimen_reproduction
capture_of_new_instance
Personnel
20 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#8] 12 guards covering 3 shifts (primary security staffing used in wage calculations). |
| Security Supervisor | 2 | [#8] On-site supervisors/shift leads included in security staffing estimate. |
| Research Scientist | 1 | [#14] Senior researcher supervising SCP study and experiments. |
| Research Assistant | 2 | [#14] Two research assistants/technicians supporting experiments and sample prep. |
| Administrative Staff | 3 | [#10] Shell-company administrative/drivers supporting cover operations and paperwork. |
Confidence Notes
Many line items are well-scoped (fueling, transport, salaries) but key uncertainties remain around legal settlements, emergency remediation, salvage offsets, and site-specific contractor rates; estimates use mid-range assumptions in Western markets.