SCP-7578
Expected annual
$17.2M
One-time setup
$131.4M
Annual recurring
$16.4M
Personnel
54
One-time capital, R&D, and contingency reserves dominate costs (primarily vessel/drone fleets, secure labs, and large mobilization reserves), while recurring staff, vessel operations, R&D/testing, and legal/cover operations drive an estimated annual operating budget of roughly $16.4M.
One-Time Capital Costs
Total: $131.4M
Annual Recurring Costs
Total: $16.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$16.4M/yr
Normal operational year with no major incidents; routine monitoring, cover operations, and R&D/testing continue.
no breach or public exposure
routine operations only
🚨
Minor Incident
$18.4M/yr
Localized activation or partial exposure requiring emergency response, limited legal/PR activity, equipment replacement, and short-term increased testing.
small activation affecting civilians
limited social-media leak or contractor exposure
loss of drones or vessel damage
🚨
Major Breach
$26.4M/yr
Significant containment breach or discovery requiring large-scale mobilization, major legal/PR efforts, and accelerated neutralization R&D.
SCP-7578 becomes aware of Foundation actions
widespread media exposure
sustained activation with civilian casualties
🚨
Catastrophic Exposure
$516.4M/yr
LK-class 'Lifted Veil' style event: SCP-7578's awareness triggers national/international crisis requiring military mobilization and mass remediation.
full public awareness of SCP-7578
nation-scale security/military response
mass memetic remediation required
Personnel
54 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 16 | [#19] Armed guards and vetting/training for vessels, facilities, and data centers (12–20 guards assumed; midpoint used). |
| Research Scientist / Memetics Researcher | 8 | [#14, #15] High-clearance memetics/thaumaturgical scientists and lab staff (6–10 specialists; midpoint used). |
| Content Production Staff | 15 | [#11] Social media/content production team (10–20 staff; midpoint used for persistent operations). |
| Crew (Cover Vessel Crew) | 15 | [#5] Rotating technical/cover crew for vessels and maintenance (~15 people cited). |
Confidence Notes
Estimates combine concrete commercial costs (hosting, vessel charter, hardware) with highly uncertain memetic/thaumaturgical R&D, contingency planning, and open-ended catastrophic scenarios; therefore overall confidence is low.