SCP-7593
Unknown
?
low confidence
SCP-7593
Expected annual
$7.8M
One-time setup
$12.9M
Annual recurring
$7.4M
Personnel
33
Initial capital expenditures (~$12.9M) are driven by heavy structural reinforcement, reality-anchor hardware, and sensor/security equipment; annual operations (~$7.44M/year) are dominated by specialized staff wages, ongoing research/resurrection budgets, intelligence operations, insurance provisioning and legal/cover story costs.
One-Time Capital Costs
Total: $12.9M
Annual Recurring Costs
Total: $7.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.4M/yr
Normal operational year with no major containment breaches or reality-anchor deployment; routine research, monitoring, and personnel costs only.
no breach
no major ritual escalation
routine investigations
🚨
Minor Incident
$8.4M/yr
Localized incident requiring amplified research effort and short-term operational surge (additional trials, emergency forensic analysis, temporary surge MTF/contractors).
unexpected ritual manifestation
localized breach requiring extra MTF/research
spike in intelligence ops
🚨
Major Breach
$22.4M/yr
Severe escalation (deity-level activity / reality-instability) forcing emergency procurement/deployment of reality-anchor systems, large-scale containment reserve draws, and extensive legal/relocation actions.
deity-level activity
reality destabilization
public exposure / large-scale breach
Personnel
33 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Tactical Theology Researcher | 6 | [#6] The core Tactical Theology research team (4–8 FTE); researchers, linguists, ritual designers. |
| Forensic Pathologist & Techs | 4 | [#3, #5] One senior forensic pathologist, 1–2 pathology techs, autopsy assistants for complex examinations. |
| Security Officer / Site-666 Armed Guards | 8 | [#16] Additional armed security and perimeter staff to raise site security posture. |
| MTF Agent / Rapid Response | 6 | [#17] Mobile Task Force personnel maintained on-call for extraction/containment and training readiness. |
| Administrative Staff / Site Support | 2 | [#18] Administrative and coordination staff to process investigations, audits, and inter-site liaison. |
| Medical Officer | 1 | [#4] Medical oversight for corpse handling, staff care, and clinical needs related to the case. |
| Engineer / Maintenance | 2 | [#1, #10] Engineers and maintenance technicians for facility hardening, SRA maintenance and general site systems. |
| IT / Cybersecurity Specialist | 2 | [#12, #27] IT/cybersecurity staff to manage air-gapped systems, secure storage and analytics pipelines. |
| Archival / Redaction Staff | 2 | [#22] Secure archival and redaction team for classification, redaction and access logging of evidence and memetic materials. |
Confidence Notes
Costs are low-confidence because the anomaly is metaphysical/divine in nature, many items are highly uncertain or open-ended (e.g., experimental resurrection, tribute demands, reality-anchor needs), and the analyst notes provide wide ranges rather than fixed procurement plans.