SCP-7596
N/A
~
medium confidence
SCP-7596
Expected annual
$5.5M
One-time setup
$48.6M
Annual recurring
$5.1M
Personnel
35
One-time capital costs are substantial due to underground reconstruction, a custom large vacuum/thermal chamber, heavy handling rigs, sensors and contingency; recurring costs are dominated by dedicated scientific and security staffing and specialized maintenance. Total up-front (including a recommended long-term reserve) is large, with steady annual operations of several million dollars.
One-Time Capital Costs
Total: $48.6M
Annual Recurring Costs
Total: $5.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.1M/yr
Normal operational year with no major incidents; routine maintenance, staffing, and monitoring only.
steady operations
no containment incidents
🚨
Minor Incident
$5.3M/yr
Localized equipment failure or small containment-support incident requiring repairs and temporary increased staffing.
vacuum seal failure
sensor/monitor failure
🚨
Major Breach
$10.1M/yr
Security breach or significant containment-related event causing major repairs, legal actions, and extended downtime.
unauthorized access
significant structural damage
🚨
Catastrophic Breach
$55.1M/yr
Attempted neutralization/move or catastrophic containment failure requiring large-scale emergency operations, relocation attempts, or major upgrades.
experimental neutralization
major uncontrolled event
🚨
Political Exposure
$7.1M/yr
Investigation, subpoena escalation, or public exposure requiring extended legal action, witness relocation, and PR/cover costs.
commission escalates
leaked information / media exposure
Personnel
35 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 18 | [#12] Core 24/7 site guards (three shifts) as specified in security staffing. |
| Rapid Response Team (Security) | 4 | [#12] On-call rapid response team (staffing included in security cost estimate). |
| Research Scientist | 13 | [#13] Dedicated scientific & technical personnel (senior physicists, engineers, technicians); mid-range of 12–15 FTEs. |
Confidence Notes
Estimates are based on detailed line-item analyst notes with dollar figures, but several items (long-term reserve, contingency percentage, administrative split) are planning-level and policy-dependent, so medium confidence is appropriate.