SCP-7602
Unknown
?
low confidence
SCP-7602
Expected annual
$6.1M
One-time setup
$26.1M
Annual recurring
$5.9M
Personnel
15
Initial setup is dominated by construction, specialized equipment and a recommended contingency reserve, totaling tens of millions one-time; recurring costs are driven by security and a sustained thaumaturgy/research program (~$5.9M/yr).
One-Time Capital Costs
Total: $26.1M
Annual Recurring Costs
Total: $5.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.9M/yr
Normal operational year with no major expansion events; contains ongoing security, thaumaturgy, monitoring and research costs.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$6.6M/yr
Limited expansion event or localized containment failure requiring cleanup, equipment replacement and elevated response.
limited_expansion
sensor_alerts
minor_equipment_losses
🚨
Major Breach
$10.9M/yr
Significant expansion event requiring large-scale mitigation, major equipment and personnel replacement and emergency operations.
large_expansion
site_wide_containment_failure
emergency_demolition_or_evacuations
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#2] 24/7 armed security rotation (Beta-777 detachment), staffing to cover shifts, leave and overtime. |
| Research Scientist / Thaumatology Specialist | 3 | [#9] Dedicated thaumaturgy/ritual specialists responsible for runic maintenance and remote ritual oversight. |
Confidence Notes
Estimates combine engineering, thaumaturgic, and contingency items with wide ranges in the analyst notes; anomalous behavior, uncertain failure rates, and specialized thaumaturgic consumables reduce confidence.