SCP-761
Safe
~
medium confidence
SCP-761
Expected annual
$1.9M
One-time setup
$5.7M
Annual recurring
$1.9M
Personnel
14
Estimated one-time startup costs are approximately $5.65M driven primarily by construction of a suspended test chamber, structural contingencies and specialized equipment; recurring yearly operations are about $1.88M driven by staff wages (security, medical, research), cover/amnestic reserves, and ongoing maintenance.
One-Time Capital Costs
Total: $5.7M
Annual Recurring Costs
Total: $1.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.9M/yr
Normal operational year with no major incidents; routine testing and maintenance only.
routine_testing
scheduled_maintenance
🚨
Minor Incident
$2.0M/yr
Localized damage from displaced object(s) requiring repairs, minor rescue, additional cover-up/amnestics and overtime.
localized_reappearance_damage
small_rescue_operation
limited_cover_action
🚨
Major Breach
$2.7M/yr
Significant entombment, structural damage or equipment loss requiring large repairs, full rescue response and substantial legal/cover operations.
structural_damage
multi-person_entombment
major_repair_and_coverup
🚨
Decommissioning Event
$2.9M/yr
Decision or forced action to permanently dismantle, remove or covertly destroy SCP-761 with associated demolition, remediation and high-level cover operations.
policy_decision_to_dismantle
catastrophic_uncontainability
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#11] 24/7 coverage with two-person teams per shift (4–6 guards indicated; staffing set to 6 to cover shifts and attrition). |
| Research Scientist | 1 | [#12] Principal anomalous-object specialist / lead researcher. |
| Technician | 2 | [#12] Technicians for experimental rigging and remote systems. |
| Medical Officer / Paramedic | 2 | [#10] On-call medical staff/trauma personnel available for tests and rescue situations. |
| Data Analyst | 1 | [#12, #5, #18] Data processing, high-speed video and sensor analysis. |
| Rescue Specialist | 2 | [#9] Trained confined-space/rescue personnel for extraction and entombment response (on-call team). |
Confidence Notes
Analyst notes provide detailed line items and ranges, allowing a structured estimate, but many costs depend heavily on existing site infrastructure, testing frequency and incident rates; contingency allocations and probabilities are judgement-based rather than empirical.