SCP-7662
Unknown
~
medium confidence
SCP-7662
Expected annual
$13.5M
One-time setup
$8.4M
Annual recurring
$12.4M
Personnel
72
Estimated one-time setup costs are approximately $8,390,000 driven by equipment, initial lab/setup, contingency reserves, and containment engineering; expected recurring operations cost about $12,390,000/year driven primarily by resident support/quarantine, security/research staff, remediation, and logistics.
One-Time Capital Costs
Total: $8.4M
Annual Recurring Costs
Total: $12.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$12.4M/yr
Normal year with scheduled monitoring, containment burns, and no major incidents.
routine_operations
scheduled_sweeps
minor_remediation
🚨
Minor Incident
$13.0M/yr
Localized regrowth requiring extra burn operations, overtime, and additional waste disposal/remediation.
localized_root_regrowth
failed_preventative_sweep
extra_burn_operations
🚨
Major Breach
$18.9M/yr
Significant containment failure requiring mass evacuation, large-scale burns, military-grade assets and expanded remediation.
rapid_root_spread
surveillance_failure
civil_unrest
🚨
Catastrophic Breach
$49.4M/yr
Full-scale escalation: SCP expands beyond local control, requiring scorched-earth options, national-level response and major resettlement/remediation.
uncontrolled_spread
regional_evacuations
international_exposure
Personnel
72 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 36 | [#3] Multi-shift perimeter guards (approx. 12 guards × 3 shifts to maintain 24/7 coverage). |
| Research Scientist | 8 | [#7, #22] Mycologists/biologists/pathologists and senior investigators assigned full-time to PROJECT KLAVAK. |
| Incident Response Specialist | 8 | [#21] Rapid reaction team members (on-call specialists for emergent outgrowths). |
| Medical Officer | 6 | [#6] Field medics, clinic staff and ambulance crew for onsite emergency response. |
| Engineer / Maintenance | 4 | [#11, #26] Heavy-equipment operators, generator/vehicle mechanics, and containment engineering maintenance staff. |
| Driver / Logistics Crew | 6 | [#16] Vehicle drivers, transport staff and logistics coordinators for sample and personnel movement. |
| Administrative Staff | 3 | [#29] Project manager(s), finance/procurement and HR support for PROJECT KLAVAK. |
| Site Director / Executive Staff | 1 | [#29] Overall site/operation director (senior management/liaison). |
Confidence Notes
Estimates are mid-range, informed by analyst notes; uncertainty remains due to unknown biological hazard level (possible BSL-4 requirements), indefinite containment duration, population compliance, and frequency of regrowth which can drive costs much higher.