SCP-7704 Unknown ? low confidence
SCP-7704
Expected annual
$19.4M
One-time setup
$378.1M
Annual recurring
$17.9M
Personnel
19
Large up-front capital to build and, if necessary, replace a deep-sea iron‑layered concrete dome (~$378M one-time) with annual operations dominated by vessel/ROV operations, contingency readiness and staffing (~$17.9M/yr). Major cost drivers are dome construction/replacement, contingency reserves, vessel/ROV ops and recurring emergency readiness.
🏗️ One-Time Capital Costs Total: $378.1M
Facilities $212.5M
[#1] Deep-sea 450 m concrete dome construction / replacement cost estimate.
Existential Planning Seed $100.0M
[#25] Catastrophic/existential risk planning reserve / initial strategic planning fund (one-time seed).
Contingency Seed $52.5M
[#16] Emergency response / containment failure contingency seed fund (one-time seed contribution).
Rov Procurement $8.0M
[#3] Purchase of 1–2 deep‑sea high‑temperature ROV units and spare manipulators/parts (procurement).
Cable Installation $2.0M
[#5] Undersea armored fiber+power cable installation (one-time option) — capital portion of #5.
Containment Traversal Equipment Initial $1.1M
[#24] One-off containment/traversal equipment (suits, memetic dampeners) initial purchase.
Specialized Sensor Suite Initial $850K
[#20] Specialized sensor suite initial procurement (gas analyzers, seafloor LIDAR/sonar/seismic nodes).
Thermal Camera Procurement $600K
[#7] Upgraded thermal imaging camera system and hardened housings (initial procurement).
Hydrophone Procurement $275K
[#6] KEPLER-200 hydrophone & ZION-A400 receiver procurement, housings and initial spares (initial purchase portion).
Communications It Initial $275K
[#18] Secure uplink / encrypted sat/fiber initial hardware and redundant storage setup (initial capital).
Equipment $0
[]
Initial Research And Lab Setup $0
[]
🔄 Annual Recurring Costs Total: $17.9M/yr
Existential Maintain Readiness $5.0M/yr
[#25] Recurring maintenance of catastrophic/existential readiness (mass amnestic readiness, global coordination exercises).
Contingency Topups $2.5M/yr
[#16] Annual top-ups to contingency fund / rapid‑deployment readiness (vessels, extra ROVs, mass amnestic readiness).
Staff Wages $2.1M/yr
[#8] Permanent scientific/containment team salaries (PI, research scientists, technicians/ROV pilots, medics, memetic officers, translators, legal/PR, admin).
Legal Diplomatic Cover $1.6M/yr
[#17] Ongoing legal, diplomatic & cover-up expenses (payments to maintain closures, media management).
Rov Operations Vessel Time $1.3M/yr
[#4] ROV operations and research vessel time for weekly monitoring runs (fuel, crew, pilots, mission planning).
Research And Monitoring $1.1M/yr
[#13] Containment research & experiment budget (controlled interviews, testing, mitigation trials).
Security And Exclusion Enforcement $750K/yr
[#9] Patrol vessels, on‑shore guards, liaison payments to coast guard/ports, detention costs.
Structural Monitoring $625K/yr
[#2] Structural monitoring & periodic deep inspection (sensors + ROV inspection hours + analysis).
Cover Story And Legal $550K/yr
[#10] Vessel & maritime insurance, legal counsel, compensation to local authorities as cover (annual insurance/cover costs).
Corrosion Control $550K/yr
[#15] Corrosion control / cathodic protection, sacrificial anodes, ROV patching and remote welding upkeep.
Environmental Monitoring $425K/yr
[#14] Continuous oceanographic monitoring, ecological impact studies and remediation.
Data Analysis $275K/yr
[#21] Data analysis, modeling and simulation computing and external consultant time.
Medical Decontamination $225K/yr
[#19] Medical & decontamination supplies, medevac retainer, heat‑injury kits and burn care readiness.
Memetic Safety Program $175K/yr
[#12] Psychological and memetic safety program (training, counseling, memetic debriefs, rapid response).
Sensor Maintenance $175K/yr
[#20] Specialized sensor suite annual maintenance and node upkeep.
Communications It Operations $110K/yr
[#18] Secure uplink operations, encrypted communications, redundant storage operations (annual O&M).
Cable Battery Replacement $100K/yr
[#5] Recurring battery replacement / maintenance for autonomous seabed nodes (recurring portion of #5).
Training And Clearance $88K/yr
[#22] Training, personnel turnover, security clearances and vetting costs.
Thermal Camera Maintenance $60K/yr
[#7] Thermal camera system annual maintenance and calibration (recurring).
Amnestic Administration $60K/yr
[#11] Class‑C amnestic manufacture, storage & administration baseline budget (per‑year).
Archival $55K/yr
[#23] Long‑term preservation/archival of anomalous data and containment documentation.
Containment Equipment Maintenance $50K/yr
[#24] Maintenance, replacement and training associated with traversal/containment equipment.
Hydrophone Maintenance $30K/yr
[#6] KEPLER-200 / ZION-A400 annual maintenance, calibration and spares (recurring).
Facilities Maintenance $0/yr
[]
Supplies And Consumables $0/yr
[]
Logistics And Transport $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $17.9M/yr
87.9% probability / year
Uneventful year of normal monitoring, maintenance, staffing, routine research and contingency top-ups.
routine monitoring scheduled maintenance no major incidents
🚨 Minor Incident $18.4M/yr
10.0% probability / year +$500K vs baseline
Localized equipment damage or a small breach requiring immediate repairs, limited amnestic administration and replacement gear.
ROV loss/damage localized dome patching several trespasser incidents requiring amnestics
🚨 Major Breach $67.9M/yr
2.0% probability / year +$50.0M vs baseline
Structural failure or larger containment breach requiring emergency deployment of multiple vessels/ROVs, large repairs and mass amnestic response in the region.
dome breach widespread equipment failure regional mass amnestic operations
🚨 Catastrophic Breach $517.9M/yr
0.1% probability / year +$500.0M vs baseline
Containment failure that allows SCP‑7704‑1 influence to scale regionally or beyond, requiring prolonged global coordination, mass amnestic production and extreme countermeasures.
full containment failure large-scale exposure to SCP-7704-1 international response & suppression
👥 Personnel 19 total
Role Count Notes
Site Director / Executive Staff 1 [#8] Senior PI / site executive oversight included in staff wages.
Research Scientist 3 [#8] Physics/thaumaturgy research scientists (2–3 described).
Technician / ROV Pilot 5 [#8] Technicians and ROV pilots (4–6 described).
Medical Officer 2 [#8] Medics for on‑scene and post‑dosing follow-up.
Memetic Safety Officer 2 [#8] Memetic safety and monitoring personnel.
Translator 2 [#8] Spanish translators to communicate with SCP‑7704‑1.
Legal / PR Liaison 2 [#8] Legal/PR liaisons (liaison to local authorities / cover story management).
Administrative Staff 2 [#8] Administrative support for scheduling, records and logistics.
📋 Confidence Notes
Large ranges and fundamentally anomalous containment requirements (Class IV reality bender) drive high uncertainty in both one-time and recurring estimates; many figures are midpoint judgments and contingency assumptions.
← SCP-7702 ↑ All SCPs SCP-7705 →