SCP-7707
Keter
~
medium confidence
SCP-7707
Expected annual
$7.1M
One-time setup
$14.4M
Annual recurring
$7.0M
Personnel
17
First-year one-time capital and contingency costs are dominated by containment construction, high-end laboratory instrumentation, and a large contingency seed; ongoing annual costs are dominated by staff wages, long-term research and monitoring, and contingency/replacement funds.
One-Time Capital Costs
Total: $14.4M
Annual Recurring Costs
Total: $7.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$7.0M/yr
Normal year with no major incidents; steady-state operations and routine research.
routine_operations
scheduled_research
no_major_incidents
🚨
Minor Incident
$8.0M/yr
Localized containment incident or equipment failure requiring emergency response, repairs, compensation and elevated legal/PR activity.
localized_equipment_damage
minor_local_breach
third-party_claims
🚨
Major Breach
$11.0M/yr
Significant containment breach or cascading failures requiring large contingency drawdown, emergency relocation, major repairs and public mitigation.
site_wide_system_failures
public_exposure
mass_medical_events
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | [#10] 24/7 security rotation; estimate based on recommended 6–8 guards and included in staff wage totals. |
| Research Scientist | 8 | [#11] Biologists, quantum/statistics researchers and lab technicians (6–10 staff) covered by research staff wages. |
| Medical Officer | 2 | [#17] On-call physician and paramedic(s) for emergency response and staff medical care. |
Confidence Notes
Analyst notes provide detailed line items and ranges, enabling a structured estimate, but the object's ability to skew probabilities and the wide ranges for several items (contingency, repair funds, research scope) produce substantial uncertainty.