SCP-7733
Unknown
~
medium confidence
SCP-7733
Expected annual
$11.2M
One-time setup
$17.0M
Annual recurring
$11.0M
Personnel
23
Initial capital outlay is dominated by site acquisition, site hardening and contingency reserves (~$17M one-time); ongoing yearly costs are driven by staff wages, risk/insurance reserves, power/fuel and remote logistics (~$11M/yr).
One-Time Capital Costs
Total: $17.0M
Annual Recurring Costs
Total: $11.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$11.0M/yr
Normal year with scheduled operations, regular maintenance, staffing and no major incidents.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$11.5M/yr
Small containment-related incident requiring armed response activation, targeted repairs, short investigations and modest legal/PR actions.
equipment_failure
small_media_exposure
localized_contamination_or_spill
🚨
Major Breach
$16.0M/yr
Significant containment breach or device malfunction requiring large-scale remediation, decommissioning, legal payouts and public exposure mitigation.
large_containment_breach
device_catastrophic_failure
public_exposure_litigation
Personnel
23 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#10] 24/7 guard shifts including supervisors and local liaison; headcount chosen within analyst range (10–16). |
| Research Scientist | 8 | [#12] SVIC operators and analysts; small team to match recurring research staffing estimate. |
| Engineer / Maintenance | 3 | [#12, #18] Electrical/electronics technicians and plant maintenance staff required for HVAC, generators and UPS. |
Confidence Notes
Analyst notes provide detailed line-item ranges, but many values (power draw, frequency of activations, lease vs purchase, anomaly-driven scaling) are uncertain; mid-point estimates used for budgeting.