SCP-775
Keter
~
medium confidence
SCP-775
Expected annual
$5.3M
One-time setup
$5.1M
Annual recurring
$5.2M
Personnel
29
First-year (one-time) capital and setup costs are roughly $5.06M, driven by heavy equipment (robots, suits, incinerator, HVAC/airlock) and large contingency reserves. Recurring annual costs are roughly $5.16M, dominated by staffing (security, technicians, scientists), ongoing R&D, and maintenance/consumables.
One-Time Capital Costs
Total: $5.1M
Annual Recurring Costs
Total: $5.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$5.2M/yr
Normal year with routine operations, monthly spraying, scheduled maintenance, and ongoing R&D; no containment incidents.
no_incident
scheduled_maintenance
routine_research
🚨
Minor Incident
$5.9M/yr
Localized containment breach or suit tear requiring targeted response, limited replacements, temporary increased staffing and medical treatments.
suit_tear_detected
localized_escape
limited_equipment_damage
🚨
Major Breach
$8.7M/yr
Significant containment failure with population spread requiring large-scale incineration/autoclave use, extensive hardware replacement, mass medical response, and legal/cover operations.
multi-unit_escape
rapid_population_explosion
structural_damage
Personnel
29 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 15 | [#16] 24/7 multi-shift guard coverage and supervisors (12 guards + ~3 supervisors). |
| Containment Technician / Haz-Mat | 5 | [#5, #17] Technicians for decon, monthly spraying, suit operation and rapid response. |
| Research Scientist | 4 | [#18, #19] Entomology/parasitology, molecular biology, pathology staff for characterization and countermeasure development. |
| Medical Officer | 1 | [#14, #15] On-site medical/quarantine responder for suspected exposures and rapid clinical interventions. |
| Engineer / Maintenance | 2 | [#9, #12] Robotics/HVAC/incinerator maintenance and facility engineering support. |
| Administrative Staff | 2 | [#31] Program management, procurement, HR, and accounting support. |
Confidence Notes
Estimates are midpoint, order-of-magnitude figures derived from ranges in analyst notes. Uncertainty remains due to choice of on-site vs. contract services, breadth of R&D effort, and stochastic incidence of breaches for a Keter-class, fast-reproducing organism.