SCP-7765 Neutralized ~ medium confidence
SCP-7765
Expected annual
$2.8M
One-time setup
$9.0M
Annual recurring
$2.7M
Personnel
16
One-time capital and setup costs are roughly $7.59M driven by three large cryogenic chambers, incinerator capability, backup power and contingency reserves; recurring annual operations are about $2.73M driven by security and specialist staffing, energy/cryogen use, monitoring and capital replacement reserves.
🏗️ One-Time Capital Costs Total: $9.0M
Equipment $6.0M
[#1, #4, #6, #9] Three custom cryogenic containment chambers (~$3,000,000), backup generators/UPS installation (~$350,000), high-capacity incinerator installation (~$1,000,000), environmental sensor/alarm installation (~$200,000), plus other installed hardware and integration.
Contingency Reserve $2.0M
[#20] One-time contingency/catastrophic-loss reserve for major containment breach, replacement of capital equipment, emergency relocation or indemnities.
Facilities $250K
[#2] Reinforced concrete pads, foundations, vibration isolation, crane rails, permits and structural engineering for heavy chambers.
Emergency Incineration Contingency $250K
[#21] One-time set-aside contingency for a large-scale incineration event (fuel, contractors, air-quality monitoring, permitted ash disposal).
Initial Research And Lab Setup $200K
[#13] Large-scale imaging equipment purchase/installation (industrial CT / large-specimen scanning capability).
Heavy Lift Transport And Rigging $150K
[#3] Mobile/gantry cranes, heavy flatbed transport, custom rigging and certified riggers for initial operations.
Legal Setup $150K
[#19] One-time legal/permit/compliance setup and cover-story structuring.
Sop Development $20K
[#15] One-time development of lockdown/incineration SOPs and contractor alignment documentation.
Secure Data Setup $20K
[#23] One-time secure logging, encrypted backups, forensic archival setup.
🔄 Annual Recurring Costs Total: $2.7M/yr
Staff Wages $1.1M/yr
[#8, #11, #17] Security salaries (~$600k), bi-weekly monitoring technicians & site scientist oversight (~$125k included in this total), research staffing (senior scientist + part-time specialists/techs ~ $400k).
Capital Replacement Reserve $500K/yr
[#22] Annual reserve for long-term replacement of refrigeration systems, sensors, generators, and heavy equipment.
Personnel Overhead $350K/yr
[#18] Benefits, payroll taxes, insurance, background checks and clearance maintenance (~30% of wage base estimated).
Supplies And Consumables $225K/yr
[#5, #14] Continuous energy/cryogen supply (~$150k/yr) and decontamination/PPE/hazardous-material consumables (~$75k/yr).
Facilities Maintenance $200K/yr
[#16] Routine building maintenance, water/sewage, janitorial, property taxes/lease, site lighting and general facilities overhead.
Research And Monitoring $120K/yr
[#10, #12] Environmental monitoring maintenance and calibration (~$20k/yr) and laboratory analysis/pathology budget (~$100k/yr).
Cover Story And Legal $50K/yr
[#19] Ongoing legal/compliance fees and cover-story/records management budget.
Incinerator Operation And Disposal $50K/yr
[#7] Incinerator maintenance, filter replacements, certified ash disposal contracts and permits, readiness tests.
Security Systems Maintenance $50K/yr
[#8] CCTV, intrusion detection, access control maintenance and equipment replacement/repairs.
Backup Power Fuel And Maintenance $30K/yr
[#4] Diesel fuel, regular generator maintenance and UPS servicing for redundancy.
Training And Drills $25K/yr
[#15] Periodic emergency response drills, refresher training and SOP updates.
It Hosting And Security $5K/yr
[#23] Hosting, encrypted backups and ongoing IT security services.
Logistics And Transport $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $2.7M/yr
94.0% probability / year
Normal year with routine monitoring, maintenance and no major incidents.
no_growth_detected routine_maintenance scheduled_research
🚨 Minor Incident $3.1M/yr
5.0% probability / year +$400K vs baseline
Localized growth or alarm requiring interior lockdown and a single large incineration/contractor mobilization but no loss of major infrastructure.
growth_detected interior_lockdown single_mass_incineration_event
🚨 Major Breach $6.2M/yr
1.0% probability / year +$3.5M vs baseline
Significant containment failure requiring mass incineration, replacement of major capital equipment and emergency relocation/indemnities.
structural_failure mass_contamination replacement_of_chambers
👥 Personnel 16 total
Role Count Notes
Security Officer / MTF Agent 12 [#8] 24/7 guard coverage (~12 guards to cover shifts), includes supervisors and overtime assumptions.
Research Scientist 1 [#11, #17] Senior/site scientist responsible for oversight, reporting and authorized examinations.
Research Specialist / Lab Technician 3 [#17, #11, #12] Part-time specialists and lab technicians for pathology, histology and specimen analyses; also perform bi-weekly checks and sample processing when authorized.
📋 Confidence Notes
Estimates are based on detailed analyst line items and standard industry costs but include order-of-magnitude assumptions (energy use, contractor rates, local/regulatory variation) and contingencies for anomalous behaviors, so confidence is medium.
← SCP-7764 ↑ All SCPs SCP-7766 →