SCP-7776
Expected annual
$18.2M
One-time setup
$130.3M
Annual recurring
$16.9M
Personnel
111
Estimated upfront containment and site conversion costs are roughly $130M (major drivers: site acquisition, hardened containment construction, and large contingency reserves). Annual operating costs are ~ $16.9M driven by staff wages, ongoing security, monitoring, and legal/cover operations.
One-Time Capital Costs
Total: $130.3M
Annual Recurring Costs
Total: $16.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$16.9M/yr
Normal operational year with no major incidents; ongoing containment, rituals, staffing, monitoring and cover maintenance.
routine operations
scheduled research and monitoring
no containment breaches
🚨
Minor Incident
$18.9M/yr
Localized containment incident requiring emergency response, repairs, short-term external contracting and medical care.
small breach or ritual-driven casualty
equipment failure requiring specialist contractors
🚨
Major Breach
$66.9M/yr
Significant containment failure requiring large-scale emergency operations, mass remediation/evacuation and heavy use of catastrophic reserves.
site-wide containment failure
widespread ritual escalation or reality alteration
regional evacuation/remediation
Personnel
111 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 48 | [#5] 24/7 armed security for perimeter and internal patrols; shift coverage and supervisors included. |
| Specialized Response Team / Containment Technician | 30 | [#6] Trained containment engineers, tactical squads and ERT for breach response and anomalous operations. |
| Research Scientist | 12 | [#7] On-site researchers studying SCP-7776 behavior and ritual dynamics. |
| Lab Technician | 6 | [#7, #9] Technical staff to operate and maintain research lab and BSL-capable equipment. |
| Medical Officer | 4 | [#17] On-site medical staff for triage, quarantine and long-term monitoring of personnel. |
| Engineer / Maintenance | 6 | [#12, #23, #28] Facility, generator and sensor maintenance; containment repairs and scheduled capital replacement work. |
| Administrative Staff | 4 | [#18, #26] Cover-story maintenance, records, limited external communications by designated personnel. |
| Site Director / Executive Staff | 1 | [Site command roles referenced in containment procedures] Overall site leadership and high-level oversight. |
Confidence Notes
Analyst notes provide broad ranges for every major cost category but SCP description lacks operational specifics (hazard type, biohazard level, mobility). Estimates use mid-range/hardened-containment assumptions for a village-integrated Site; uncertainties in local land costs, true scope of rituals/effects and escalation probability reduce confidence.